If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0414241407000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.526533,"lon":-113.348867,"icon":""}]} |
Location: 00/07-14-041-24W4/0 | |
Location Alias: 00/07-14-41-24 W4M | |
Location Alias 2: 00/07-14-041-24 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 041 | |
Meridian: 4 | |
Range: 24 | |
Section: 14 | |
County/Municipality: Lacombe County | |
Well Name: SOHIO IMP TEES 7-14-41-24 | |
Operator Name: Sohio Petroleum Company | |
License Number: 0014749 | |
License Date: 1958-02-10 | |
License Status: RecCertified | |
Spud Date: 1958-02-17 | |
Final Drill Date: 1958-03-15 | |
Well Total Depth: 1632.80 m | |
Surface Hole Latitude: 52.526533 | |
Surface Hole Longitude: -113.348867 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1958-02-10 | Obtained License |
1958-02-17 | Lost Circulation Occurred |
1958-03-08 | Drill Stem Test Performed |
1958-03-15 | Finished Drilling |
1958-03-17 | Production Casing Operation Performed |
1958-03-18 | Well Mode changed to Drilled and Cased |
1960-08-18 | Perforation Treatment Performed - Jet Perforation |
1961-12-28 | Well Began Production |
1961-12-28 | Well Fluid changed to Gas |
1961-12-28 | Well Mode changed to Flowing |
1962-08-06 | Perforation Treatment Performed - Fractured |
1964-05-23 | Perforation Treatment Performed - Cement Squeeze |
1964-05-26 | Perforation Treatment Performed - Jet Perforation |
1964-05-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1964-06-02 | Perforation Treatment Performed - Condensate Squeeze |
1964-11-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1964-11-18 | Well Abandoned |
1964-11-18 | Well Fluid changed to Gas |
1964-11-18 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1960-08-18 | Perforation | 1545.90 | 1548.40 | 13 |
1960-08-18 | Perforation | 1539.20 | 1540.50 | 26 |
1962-08-06 | Fracture | 1539.20 | 1548.40 | 0 |
1964-05-23 | Cement Squeeze | 1539.20 | 1548.40 | 0 |
1964-05-26 | Perforation | 1546.60 | 1548.40 | 10 |
1964-05-28 | Acid Treatment | 1546.60 | 1548.40 | 0 |
1964-06-02 | Condensate Squeeze | 1546.60 | 1548.40 | 0 |
1964-11-13 | Packing Device Capped w/Cement | 1534.70 | 1534.70 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1958-02-17 | Lost Circulation | 19.80 | 179.80 |
For data sources see[6]