X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414251510000

Well Details

Well ID: 0414251510000
Loading map...
Location: 00/10-15-041-25W4/0
Location Alias: 00/10-15-41-25 W4M
Location Alias 2: 00/10-15-041-25 W4/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 25
Section: 15
County/Municipality: Lacombe County
Well Name: OEI CHIGWELL 10-15-41-25
Operator Name: AlphaBow Energy Ltd.
License Number: 0059442
License Date: 1976-07-28
License Status: Suspension
Spud Date: 1976-08-09
Final Drill Date: 1976-08-18
Well Total Depth: 1677.00 m
Surface Hole Latitude: 52.531910
Surface Hole Longitude: -113.513975

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-07-28 Obtained License
1976-08-15 Drill Stem Test Performed
1976-08-18 Drill Stem Test Performed
1976-08-18 Finished Drilling
1976-08-18 Well Mode changed to Drilled and Cased
1976-08-19 Drill Stem Test Performed
1976-08-20 Drill Stem Test Performed
1976-08-22 Production Casing Operation Performed
1976-09-10 Perforation Treatment Performed - Jet Perforation
1976-09-22 Perforation Treatment Performed - Jet Perforation
1976-09-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-09-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1976-09-25 Perforation Treatment Performed - Cement Squeeze
1976-09-27 Perforation Treatment Performed - Jet Perforation
1976-09-28 Perforation Treatment Performed - Jet Perforation
1976-09-29 Perforation Treatment Performed - Cement Squeeze
1976-09-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-09-30 Perforation Treatment Performed - Cement Squeeze
1976-10-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-10-07 Perforation Treatment Performed - Fractured
1976-10-19 Perforation Treatment Performed - Cement Squeeze
1976-10-20 Perforation Treatment Performed - Jet Perforation
1976-11-04 Well Began Production
1976-11-04 Well Fluid changed to Crude Oil
1976-11-04 Well Mode changed to Pumping
2002-04-30 Well Fluid changed to Crude Oil
2002-04-30 Well Mode changed to Suspended
2007-08-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-08-30 Plug Back Performed
2007-08-30 Well Fluid changed to Crude Oil
2007-08-30 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-09-10 Perforation 1630.10 1631.30 7
1976-09-30 Acid Treatment 1569.70 1570.90 0
1976-10-01 Acid Treatment 1569.70 1570.90 0
1976-10-07 Fracture 1569.70 1570.90 0
1976-10-19 Cement Squeeze 1569.70 1570.90 0
1976-10-20 Perforation 1410.30 1413.70 7
2007-08-30 Packing Device Capped w/Cement 1397.00 1405.00 0
1976-09-22 Perforation 1624.00 1625.80 7
1976-09-23 Acid Treatment 1624.00 1625.80 0
1976-09-25 Cement Squeeze 1624.00 1625.80 0
1976-09-25 Packing Device Capped w/Cement 1616.40 1627.00 0
1976-09-27 Perforation 1569.70 1570.90 7
1976-09-28 Perforation 1596.50 1597.80 7
1976-09-29 Cement Squeeze 1596.50 1597.80 0
1976-09-30 Cement Squeeze 1596.50 1597.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 1248 0.0 0.0 0.0
1977 3220 0.0 0.0 0.0
1978 1951 0.0 0.0 0.0
1979 2773 0.0 0.0 0.0
1981 4048 0.0 0.0 0.0
1982 7262 0.0 0.0 0.0
1983 7059 0.0 0.0 0.0
1984 7423 0.0 0.0 0.0
1985 7654 0.0 0.0 0.0
1986 1813 0.0 0.0 0.0
1987 96 0.0 0.0 0.0

For data sources see[5]

References