X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414252801000

Well Details

Well ID: 0414252801000
Loading map...
Location: 00/01-28-041-25W4/0
Location Alias: 00/01-28-41-25 W4M
Location Alias 2: 00/01-28-041-25 W4/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 25
Section: 28
County/Municipality: Lacombe County
Well Name: OEI CHIGWELL 1-28-41-25
Operator Name: AlphaBow Energy Ltd.
License Number: 0066418
License Date: 1977-10-28
License Status: Suspension
Spud Date: 1977-10-28
Final Drill Date: 1977-11-05
Well Total Depth: 1728.20 m
Surface Hole Latitude: 52.552793
Surface Hole Longitude: -113.534922

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-10-28 Obtained License
1977-11-05 Finished Drilling
1977-11-05 Well Mode changed to Drilled and Cased
1977-11-07 Drill Stem Test Performed
1977-11-08 Production Casing Operation Performed
1977-11-28 Perforation Treatment Performed - Jet Perforation
1977-11-30 Perforation Treatment Performed - Fractured
1977-12-01 Perforation Treatment Performed - Fractured
1977-12-01 Perforation Treatment Performed - Jet Perforation
1978-02-14 Well Began Production
1978-02-14 Well Fluid changed to Crude Oil
1978-02-14 Well Mode changed to Pumping
1996-11-14 Perforation Treatment Performed - Cement Squeeze
1996-11-14 Plug Back Performed
1996-11-15 Perforation Treatment Performed - Cement Squeeze
1996-11-15 Plug Back Performed
1996-11-22 Perforation Treatment Performed - Cement Squeeze
1996-11-22 Perforation Treatment Performed - Jet Perforation
1996-11-22 Well Fluid changed to Crude Oil
1996-11-22 Well Mode changed to Abandoned Zone
1996-11-29 Perforation Treatment Performed - Jet Perforation
1996-11-29 Well Log Performed
1997-11-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-11-20 Plug Back Performed
1997-11-22 Perforation Treatment Performed - Jet Perforation
1997-11-25 Perforation Treatment Performed - Jet Perforation
1997-11-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-11-30 Perforation Treatment Performed - Jet Perforation
1997-12-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-12-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-12-06 Plug Back Performed
1997-12-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-10-11 Well Log Performed
2000-10-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-10-12 Perforation Treatment Performed - Jet Perforation
2000-10-12 Well Log Performed
2000-10-13 Perforation Treatment Performed - Fractured
2010-11-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-11-17 Well Log Performed
2016-07-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-11-28 Perforation 1601.40 1603.90 7
1996-11-29 Perforation 1699.60 1701.70 18
1996-11-29 Perforation 1702.60 1704.40 18
1997-11-20 Packing Device Capped w/Cement 1690.00 1698.00 0
1997-11-22 Perforation 1655.00 1657.50 13
1997-11-25 Perforation 1656.00 1658.50 18
1997-11-28 Acid Treatment 1656.00 1658.50 0
1997-11-30 Perforation 1633.50 1634.70 18
1997-11-30 Perforation 1641.50 1643.50 18
1997-12-03 Acid Treatment 1633.50 1643.50 0
1997-12-06 Packing Device Capped w/Cement 1644.00 1652.00 0
1977-11-28 Perforation 1608.70 1611.20 7
1997-12-07 Packing Device Capped w/Cement 1620.00 1628.00 0
2000-10-12 Packing Device Capped w/Cement 1592.00 1600.00 0
2000-10-12 Perforation 1494.10 1498.10 18
2000-10-13 Fracture 1494.10 1498.10 0
2010-11-17 Packing Device Capped w/Cement 1482.00 1490.00 0
2016-07-21 Packing Device Capped w/Cement 1426.90 1434.90 0
1977-11-30 Fracture 1601.40 1611.20 0
1977-12-01 Perforation 1447.80 1450.80 7
1977-12-01 Fracture 1447.80 1450.80 0
1996-11-14 Cement Squeeze 1601.40 1611.20 0
1996-11-15 Cement Squeeze 1447.80 1450.80 0
1996-11-22 Perforation 1601.40 1611.20 7
1996-11-22 Cement Squeeze 1601.40 1611.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1978 3457 0.0 0.0 0.0
1979 3418 0.0 0.0 0.0
1980 8136 0.0 0.0 0.0
1981 8555 0.0 0.0 0.0
1982 5129 0.0 0.0 0.0
1983 6410 0.0 0.0 0.0
1984 7444 0.0 0.0 0.0
1985 7584 0.0 0.0 0.0
1986 1868 0.0 0.0 0.0
1989 720 0.0 0.0 0.0
1990 1488 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-07-21 No Incident Encountered 0.00 0.00

For data sources see[6]

References