If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0415020504000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.495629,"lon":-114.262813,"icon":""}]} |
Location: 00/04-05-041-02W5/0 | |
Location Alias: 00/04-05-41-02 W5M | |
Location Alias 2: 00/04-05-041-02 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 041 | |
Meridian: 5 | |
Range: 02 | |
Section: 05 | |
County/Municipality: Lacombe County | |
Well Name: CVE GILBY 4-5-41-2 | |
Operator Name: Cenovus Energy Inc. | |
License Number: 0008477 | |
License Date: 1954-09-14 | |
License Status: Suspension | |
Spud Date: 1954-09-30 | |
Final Drill Date: 1955-03-23 | |
Well Total Depth: 3592.10 m | |
Surface Hole Latitude: 52.495629 | |
Surface Hole Longitude: -114.262813 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1954-09-14 | Obtained License |
1954-11-02 | Drill Stem Test Performed |
1954-11-03 | Drill Stem Test Performed |
1954-11-04 | Drill Stem Test Performed |
1954-11-12 | Drill Stem Test Performed |
1954-11-13 | Drill Stem Test Performed |
1954-11-16 | Drill Stem Test Performed |
1954-11-28 | Drill Stem Test Performed |
1954-12-21 | Drill Stem Test Performed |
1955-01-08 | Production Casing Operation Performed |
1955-03-23 | Drill Stem Test Performed |
1955-03-23 | Finished Drilling |
1955-03-23 | Well Mode changed to Drilled and Cased |
1955-04-01 | Perforation Treatment Performed - Bullet Perforation |
1955-04-01 | Perforation Treatment Performed - Jet Perforation |
1955-06-11 | Well Began Production |
1955-06-11 | Well Fluid changed to Crude Oil |
1955-06-11 | Well Mode changed to Flowing |
1956-02-09 | Well Fluid changed to Crude Oil |
1956-02-09 | Well Mode changed to Pumping |
1965-10-19 | Perforation Treatment Performed - Cement Squeeze |
1965-10-26 | Perforation Treatment Performed - Selective Jet Perforations |
1965-10-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1965-10-27 | Well Fluid changed to Crude Oil |
1965-10-27 | Well Mode changed to Abandoned Zone |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1955-04-01 | Bullet Perforation | 1822.70 | 1825.80 | 13 |
1965-10-26 | Selective Jet Perforations | 2031.80 | 2033.30 | 0 |
1965-10-26 | Selective Jet Perforations | 2034.80 | 2034.80 | 0 |
1965-10-26 | Selective Jet Perforations | 2026.60 | 2027.80 | 0 |
1965-10-26 | Selective Jet Perforations | 2028.70 | 2028.70 | 0 |
1965-10-27 | Acid Treatment | 2026.60 | 2050.10 | 0 |
1955-04-01 | Perforation | 1822.70 | 1825.80 | 13 |
1965-10-19 | Cement Squeeze | 1822.70 | 1825.80 | 0 |
1965-10-26 | Selective Jet Perforations | 2037.90 | 2039.40 | 0 |
1965-10-26 | Selective Jet Perforations | 2040.90 | 2042.50 | 0 |
1965-10-26 | Selective Jet Perforations | 2044.00 | 2044.00 | 0 |
1965-10-26 | Selective Jet Perforations | 2034.80 | 2035.80 | 0 |
1965-10-26 | Selective Jet Perforations | 2036.70 | 2037.60 | 0 |
1965-10-26 | Selective Jet Perforations | 2028.70 | 2030.30 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]