X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0415021014002

Well Details

Well ID: 0415021014002
Loading map...
Location: 00/14-10-041-02W5/2
Location Alias: 00/14-10-41-02 W5M
Location Alias 2: 00/14-10-041-02 W5/02
Country: Canada
Province: Alberta
Township: 041
Meridian: 5
Range: 02
Section: 10
County/Municipality: Lacombe County
Well Name: JOURNEY GILBY 14-10-41-2
Operator Name: Journey Energy Inc.
License Number: 0243533
License Date: 2000-10-24
License Status: Suspension
Spud Date: 2000-11-02
Final Drill Date: 2000-11-17
Well Total Depth: 2098.00 m
Surface Hole Latitude: 52.519673
Surface Hole Longitude: -114.210021

For data sources see[1][2]

Well History

Date Event
2000-10-24 Obtained License
2000-11-02 Lost Circulation Occurred
2000-11-04 Surface Casing Operation Performed
2000-11-17 Finished Drilling
2000-11-17 Well Log Performed
2000-11-17 Well Mode changed to Drilled and Cased
2000-11-18 Well Log Performed
2000-11-19 Drill Stem Test Performed
2000-11-20 Production Casing Operation Performed
2000-11-21 Rig Released
2000-12-12 Well Log Performed
2000-12-13 Well Log Performed
2001-01-04 Perforation Treatment Performed - Jet Perforation
2001-01-06 Perforation Treatment Performed - Fractured
2004-02-29 Perforation Treatment Performed - Jet Perforation
2004-03-04 Perforation Treatment Performed - Fractured
2004-06-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-06-12 Plug Back Performed
2004-06-12 Well Mode changed to Abandoned Zone
2004-06-13 Perforation Treatment Performed - Jet Perforation
2004-06-18 Perforation Treatment Performed - Fractured
2005-08-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-08-10 Plug Back Performed
2005-08-11 Perforation Treatment Performed - Jet Perforation
2006-02-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-02-24 Plug Back Performed
2006-03-02 Perforation Treatment Performed - Fractured
2006-03-02 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-01-04 Perforation 2041.00 2045.00 17
2006-02-24 Packing Device Capped w/Cement 1082.00 1090.00 0
2006-03-02 Perforation 906.00 909.00 17
2006-03-02 Perforation 900.00 902.00 17
2006-03-02 Perforation 890.00 893.00 17
2006-03-02 Perforation 888.00 889.00 17
2006-03-02 Perforation 876.00 878.00 17
2006-03-02 Perforation 872.00 875.00 17
2006-03-02 Perforation 854.00 856.00 17
2006-03-02 Perforation 850.00 851.00 17
2006-03-02 Perforation 838.00 839.00 17
2001-01-06 Fracture 2041.00 2045.00 0
2006-03-02 Perforation 835.50 836.50 17
2006-03-02 Perforation 828.00 830.00 17
2006-03-02 Perforation 813.00 814.00 17
2006-03-02 Perforation 808.00 810.00 17
2006-03-02 Perforation 774.50 778.00 17
2006-03-02 Perforation 755.00 760.00 17
2006-03-02 Perforation 723.00 727.00 17
2006-03-02 Perforation 698.50 703.00 17
2006-03-02 Perforation 637.00 638.00 17
2006-03-02 Perforation 584.00 585.50 17
2004-02-29 Perforation 2002.00 2004.50 17
2006-03-02 Fracture 808.00 810.00 0
2006-03-02 Fracture 813.00 814.00 0
2006-03-02 Fracture 774.50 778.00 0
2006-03-02 Fracture 755.00 760.00 0
2006-03-02 Fracture 723.00 727.00 0
2006-03-02 Fracture 698.50 703.00 0
2006-03-02 Fracture 637.00 638.00 0
2006-03-02 Fracture 584.00 585.50 0
2004-03-04 Fracture 2002.00 2004.50 0
2004-06-12 Packing Device Capped w/Cement 1988.00 1997.00 0
2004-06-13 Perforation 1887.00 1892.00 17
2004-06-18 Fracture 1887.00 1892.00 0
2005-08-10 Packing Device Capped w/Cement 1870.00 1878.00 0
2005-08-11 Perforation 1095.00 1099.00 17

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2000-11-02 Lost Circulation 30.00 60.00

For data sources see[5]

References