X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0415030510000

Well Details

Well ID: 0415030510000
Loading map...
Location: 00/10-05-041-03W5/0
Location Alias: 00/10-05-41-03 W5M
Location Alias 2: 00/10-05-041-03 W5/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 5
Range: 03
Section: 05
County/Municipality: Lacombe County
Well Name: PW GAS GILBY 10-5-41-3
Operator Name: TAQA North Ltd.
License Number: 0022869
License Date: 1962-08-15
License Status: Suspension
Spud Date: 1962-08-20
Final Drill Date: 1962-09-04
Well Total Depth: 2182.40 m
Surface Hole Latitude: 52.503676
Surface Hole Longitude: -114.393847

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1962-08-15 Obtained License
1962-08-20 Lost Circulation Occurred
1962-09-04 Finished Drilling
1962-09-04 Well Mode changed to Drilled and Cased
1962-09-05 Drill Stem Test Performed
1962-09-06 Drill Stem Test Performed
1962-09-07 Drill Stem Test Performed
1962-09-08 Production Casing Operation Performed
1962-09-13 Perforation Treatment Performed - Jet Perforation
1962-10-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-10-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1962-10-12 Perforation Treatment Performed - Jet Perforation
1962-10-13 Perforation Treatment Performed - Acid Wash - No Pressure
1962-10-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-10-20 Perforation Treatment Performed - Fractured
1962-11-07 Well Began Production
1962-11-07 Well Fluid changed to Crude Oil
1962-11-07 Well Mode changed to Pumping
1963-05-26 Perforation Treatment Performed - Jet Perforation
1963-05-26 Well Fluid changed to Crude Oil
1963-05-26 Well Mode changed to Pumping
1963-10-03 Perforation Treatment Performed - Jet Perforation
1963-11-05 Perforation Treatment Performed - Jet Perforation
1964-10-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1964-10-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-10-12 Perforation Treatment Performed - Jet Perforation
1964-10-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-08-12 Well Fluid changed to Crude Oil
1969-08-12 Well Mode changed to Suspended
1973-05-29 Perforation Treatment Performed - Cement Squeeze
1973-05-29 Well Fluid changed to Crude Oil
1973-05-29 Well Mode changed to Abandoned Zone
2008-08-13 Well Log Performed
2008-08-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-08-26 Plug Back Performed
2008-08-26 Well Log Performed
2008-08-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-08-27 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1962-09-13 Perforation 2155.20 2156.20 7
1963-11-05 Perforation 2151.30 2152.50 7
1964-10-10 Packing Device Capped w/Cement 2148.80 2148.80 0
1964-10-12 Perforation 2122.60 2123.50 10
1964-10-12 Acid Treatment 2122.60 2123.50 0
1964-10-21 Acid Treatment 2122.60 2123.50 0
1973-05-29 Cement Squeeze 1914.10 1917.80 0
2008-08-26 Packing Device Capped w/Cement 1928.00 1936.00 0
2008-08-27 Packing Device Capped w/Cement 1900.00 1908.00 0
1962-10-06 Acid Treatment 2155.20 2156.20 0
1962-10-12 Packing Device Capped w/Cement 2127.50 2127.50 0
1962-10-12 Perforation 1915.10 1916.60 13
1962-10-13 Acid Wash 1915.10 1916.60 0
1962-10-16 Acid Treatment 1915.10 1916.60 0
1962-10-20 Fracture 1915.10 1916.60 0
1963-05-26 Perforation 2155.20 2156.20 7
1963-10-03 Perforation 2153.10 2154.30 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 268 0.0 0.0 0.0
1968 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1962-08-20 Lost Circulation 0.10 76.20

For data sources see[6]

References