X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0415041308003

Well Details

Well ID: 0415041308003
Loading map...
Location: 00/08-13-041-04W5/3
Location Alias: 00/08-13-41-04 W5M
Location Alias 2: 00/08-13-041-04 W5/03
Country: Canada
Province: Alberta
Township: 041
Meridian: 5
Range: 04
Section: 13
County/Municipality: Lacombe County
Well Name: CVE GILBY 8-13-41-4
Operator Name: Cenovus Energy Inc.
License Number: 0146155
License Date: 1990-11-02
License Status: RecCertified
Spud Date: 2001-11-07
Final Drill Date: 2001-11-19
Well Total Depth: 2195.00 m
Surface Hole Latitude: 52.527250
Surface Hole Longitude: -114.438702

For data sources see[1][2]

Well History

Date Event
1990-11-02 Obtained License
2001-11-19 Finished Drilling
2001-11-19 Rig Released
2001-11-19 Well Mode changed to Drilled and Cased
2001-11-20 Perforation Treatment Performed - Jet Perforation
2001-11-22 Perforation Treatment Performed - Cement Squeeze
2001-11-22 Plug Back Performed
2001-11-25 Perforation Treatment Performed - Jet Perforation
2001-11-26 Perforation Treatment Performed - Cement Squeeze
2001-11-26 Plug Back Performed
2001-11-26 Well Mode changed to Abandoned Zone
2001-11-29 Perforation Treatment Performed - Jet Perforation
2001-11-29 Well Log Performed
2001-12-01 Perforation Treatment Performed - Fractured
2002-07-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-07-19 Plug Back Performed
2002-07-22 Perforation Treatment Performed - Jet Perforation
2002-07-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-07-23 Well Log Performed
2002-07-25 Perforation Treatment Performed - Jet Perforation
2002-07-25 Well Log Performed
2002-07-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-07-26 Perforation Treatment Performed - Jet Perforation
2002-07-26 Well Log Performed
2002-07-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-07-28 Plug Back Performed
2002-07-28 Well Log Performed
2006-01-30 Perforation Treatment Performed - Jet Perforation
2006-01-30 Well Log Performed
2006-01-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-01-31 Perforation Treatment Performed - Remedial Casing
2006-02-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-02-02 Perforation Treatment Performed - Jet Perforation
2006-02-02 Perforation Treatment Performed - Remedial Casing
2006-03-01 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-11-20 Perforation 1815.00 1817.00 17
2002-07-22 Perforation 1096.00 1098.00 20
2002-07-22 Perforation 1093.00 1095.00 20
2002-07-23 Packing Device Capped w/Cement 1080.00 1088.00 0
2002-07-25 Perforation 1085.50 1085.60 2
2002-07-26 Packing Device Capped w/Cement 1072.00 1080.00 0
2002-07-26 Perforation 1055.00 1061.00 20
2002-07-28 Packing Device Capped w/Cement 1040.00 1048.00 0
2006-01-30 Perforation 713.00 714.00 13
2006-01-31 Remedial Casing Cementing 713.00 714.00 0
2006-01-31 Packing Device Capped w/Cement 700.00 709.00 0
2001-11-20 Perforation 1789.00 1808.00 17
2006-02-02 Perforation 445.00 446.00 14
2006-02-02 Remedial Casing Cementing 445.00 446.00 0
2006-02-02 Packing Device Capped w/Cement 432.00 441.00 0
2001-11-20 Perforation 1785.00 1786.00 17
2001-11-22 Cement Squeeze 1789.00 1808.00 0
2001-11-25 Perforation 1924.00 1932.00 17
2001-11-26 Cement Squeeze 1924.00 1932.00 0
2001-11-29 Perforation 2071.00 2075.00 20
2001-12-01 Fracture 2071.00 2075.00 0
2002-07-19 Packing Device Capped w/Cement 2057.00 2065.00 0

For data sources see[4]



References