X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

100.01-03-009-28W1

Well Details

Well ID: 100.01-03-009-28W1
Loading map...
Well Name: Tundra Daly Sinclair HZNTL
Country: Canada
Province: Manitoba
Township: 009
Meridian: W1
Range: 28
Section: 10
Division: Division No. 6
Subdivision: Pipestone
Operator Name: Tundra Oil & Gas Limited
License Status: Capable Of Oil Production
Spud Date: 2011-01-12
License Date: 2011-01-14
Well Total Depth: 2344.00
Latitude: 49.72512569
Longitude: -101.19330123

For data sources see[1]

Well History

Date Event
2011-01-14 Location
2011-01-24 Drilling Ahead
2011-01-26 Waiting On Service Rig
2011-02-13 Completing
2011-03-31 Capable Of Oil Production

For data sources see[2]

Spud Data

Spud Date Contractor Rig Number
2011-01-12 Ensign - Trinidad Drilling Inc. 9

For data sources see[3]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots Shot Volume (m3) Last Modified
2011-02-15 HOLLOW STEEL CARRIER 2309.75 2310.25 9 N/A 2011-08-30
2011-02-15 HOLLOW STEEL CARRIER 2254.75 2255.25 9 N/A 2011-08-30
2011-02-15 HOLLOW STEEL CARRIER 2200.75 2201.25 9 N/A 2011-08-30
2011-02-15 HOLLOW STEEL CARRIER 2146.81 2157.31 9 N/A 2011-08-30
2011-02-15 HOLLOW STEEL CARRIER 2089.64 2090.14 9 N/A 2011-08-30
2011-02-15 HOLLOW STEEL CARRIER 2021.88 2022.38 9 N/A 2011-08-30
2011-02-15 HOLLOW STEEL CARRIER 1968.64 1969.14 9 N/A 2011-08-30
2011-02-15 HOLLOW STEEL CARRIER 1914.60 1915.10 9 N/A 2011-08-30
2011-02-15 HOLLOW STEEL CARRIER 1846.65 1847.15 9 N/A 2011-08-30
2011-02-15 HOLLOW STEEL CARRIER 1779.64 1780.14 9 N/A 2011-08-30
2011-02-15 HOLLOW STEEL CARRIER 1724.69 1725.19 9 N/A 2011-08-30
2011-02-15 HOLLOW STEEL CARRIER 1670.76 1671.26 9 N/A 2011-08-30
2011-02-15 HOLLOW STEEL CARRIER 1617.58 1618.08 9 N/A 2011-08-30
2011-02-15 HOLLOW STEEL CARRIER 1563.49 1563.99 9 N/A 2011-08-30
2011-02-15 HOLLOW STEEL CARRIER 1496.49 1496.99 9 N/A 2011-08-30
2011-02-15 HOLLOW STEEL CARRIER 1442.61 1443.11 9 N/A 2011-08-30
2011-02-15 HOLLOW STEEL CARRIER 1388.71 1389.21 9 N/A 2011-08-30
2011-02-15 HOLLOW STEEL CARRIER 1320.81 1321.31 9 N/A 2011-08-30
2011-02-15 HOLLOW STEEL CARRIER 1267.84 1268.34 9 N/A 2011-08-30
2011-02-15 HOLLOW STEEL CARRIER 1213.61 1214.11 9 N/A 2011-08-30
2011-02-15 HOLLOW STEEL CARRIER 1159.92 1160.42 9 N/A 2011-08-30
2011-02-15 HOLLOW STEEL CARRIER 1091.69 1092.19 9 N/A 2011-08-30
2011-02-15 HOLLOW STEEL CARRIER 1037.67 1038.17 9 N/A 2011-08-30
2011-02-15 HOLLOW STEEL CARRIER 983.52 984.02 9 N/A 2011-08-30

For data sources see[4]

Well Treatment Data

Start Date Treatment Type Treatment Fluid Treatment Amount Additive Type Agent Type Agent Amount
2011-07-01 FRAC N/A 20/40 SAND 3.0
2011-07-01 FRAC N/A 20/40 SAND 3.0
2011-07-02 FRAC N/A 20/40 SAND 3.0
2011-07-02 FRAC N/A 20/40 SAND 3.0
2011-07-02 FRAC N/A 20/40 SAND 3.0
2011-07-02 FRAC N/A 20/40 SAND 3.0
2011-07-02 FRAC N/A 20/40 SAND 3.0
2011-07-02 FRAC N/A 20/40 SAND 3.0
2011-07-02 FRAC N/A 20/40 SAND 3.0
2011-07-02 FRAC N/A 20/40 SAND 3.0
2011-07-02 FRAC N/A 20/40 SAND 3.0
2011-07-01 FRAC N/A 20/40 SAND 3.0
2011-07-02 FRAC N/A 20/40 SAND 3.0
2011-07-02 FRAC N/A 20/40 SAND 3.0
2011-07-02 FRAC N/A 20/40 SAND 3.0
2011-07-02 FRAC N/A 20/40 SAND 3.0
2011-07-02 FRAC N/A 20/40 SAND 3.0
2011-07-01 FRAC N/A 20/40 SAND 3.0
2011-07-01 FRAC N/A 20/40 SAND 3.0
2011-07-01 FRAC N/A 20/40 SAND 3.0
2011-07-01 FRAC N/A 20/40 SAND 3.0
2011-07-01 FRAC N/A 20/40 SAND 3.0
2011-07-01 FRAC N/A 20/40 SAND 3.0
2011-07-01 FRAC N/A 20/40 SAND 3.0

For data sources see[5]

Production Data

Period Operator Name Oil Quantity (m3) Oil Production Days GSD Quantity (m3)
2014 Tundra Oil & Gas Limited 622.90 0 0.00
2015 Tundra Oil & Gas Limited 631.00 0 0.00
2016 Tundra Oil & Gas Limited 413.60 0 0.00
2017 Tundra Oil & Gas Limited 315.40 0 0.00
2018 Tundra Oil & Gas Limited 223.20 0 0.00
2019 Tundra Oil & Gas Limited 41.50 0 0.00
2020 Tundra Oil & Gas Limited 12.50 0 0.00

For data sources see[6]

Waste Data

Period Operator H2O Quantity (m3) H20 Waste Production Days Gas Quantity (m3) Gas Waste Production Days CO2 Quantity (m3) SSW Quantity (m3)
2014 Tundra Oil & Gas Limited 2,166.20 336 0.00 0 0.00 0.00
2015 Tundra Oil & Gas Limited 1,546.30 320 0.00 0 0.00 0.00
2016 Tundra Oil & Gas Limited 1,203.60 362 0.00 0 0.00 0.00
2017 Tundra Oil & Gas Limited 1,081.60 357 0.00 0 0.00 0.00
2018 Tundra Oil & Gas Limited 1,052.50 342 0.00 0 0.00 0.00
2019 Tundra Oil & Gas Limited 296.60 89 0.00 0 0.00 0.00
2020 Tundra Oil & Gas Limited 113.40 60 0.00 0 0.00 0.00

For data sources see[7]

References

  1. "Digital Data - Well". Province of Manitoba: Growth, Enterprise and Trade Branch. 2020-06-12. Retrieved 2020-07-30. 
  2. "Digital Data - Status History". Province of Manitoba: Growth, Enterprise and Trade Branch. 2020-06-12. Retrieved 2020-07-30. 
  3. "Digital Data - Drilling Rigs". Province of Manitoba: Growth, Enterprise and Trade Branch. 2020-06-12. Retrieved 2020-07-30. 
  4. "Digital Data - Perfs". Province of Manitoba: Growth, Enterprise and Trade Branch. 2020-06-12. Retrieved 2020-07-30. 
  5. "Digital Data - Well Treatments". Province of Manitoba: Growth, Enterprise and Trade Branch. 2020-06-12. Retrieved 2020-07-30. 
  6. "Production Reports". Province of Manitoba: Growth, Enterprise and Trade Branch. 2020-05-24. Retrieved 2020-07-30. 
  7. "Production Reports". Province of Manitoba: Growth, Enterprise and Trade Branch. 2020-05-24. Retrieved 2020-07-30.