If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 100.08-10-008-28W1 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.64210054,"lon":-101.21159105,"icon":""}]} |
Well Name: Ewart Unit No. 14 HZNTL WIW | |
Country: Canada | |
Province: Manitoba | |
Township: 008 | |
Meridian: W1 | |
Range: 28 | |
Section: 10 | |
Division: Division No. 6 | |
Subdivision: Pipestone | |
Operator Name: Tundra Oil & Gas Limited | |
License Status: Water Injection Well | |
Spud Date: 2010-07-08 | |
License Date: 2010-09-15 | |
Well Total Depth: 2232.00 | |
Latitude: 49.64210054 | |
Longitude: -101.21159105 |
For data sources see[1]
Date | Event |
---|---|
2010-09-15 | Location |
2010-12-06 | Drilling Ahead |
2010-12-10 | Waiting On Service Rig |
2011-01-16 | Completing |
2011-02-25 | Capable Of Oil Production |
2019-09-28 | Water Injection Well |
For data sources see[2]
Spud Date | Contractor | Rig Number |
---|---|---|
2010-07-08 | Ensign - Trinidad Drilling Inc. | 9 |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots | Shot Volume (m3) | Last Modified |
---|---|---|---|---|---|---|
2011-01-18 | HOLLOW STEEL CARRIER | 2207.75 | 2208.25 | 17 | N/A | 2011-03-18 |
2011-01-18 | HOLLOW STEEL CARRIER | 2153.76 | 2154.26 | 17 | N/A | 2011-03-18 |
2011-01-18 | HOLLOW STEEL CARRIER | 2085.77 | 2086.27 | 17 | N/A | 2011-03-18 |
2011-01-18 | HOLLOW STEEL CARRIER | 2029.67 | 2030.17 | 17 | N/A | 2011-03-18 |
2011-01-18 | HOLLOW STEEL CARRIER | 1975.75 | 1976.25 | 17 | N/A | 2011-03-18 |
2011-01-18 | HOLLOW STEEL CARRIER | 1921.75 | 1922.25 | 17 | N/A | 2011-03-18 |
2011-01-18 | HOLLOW STEEL CARRIER | 1853.75 | 1854.25 | 17 | N/A | 2011-03-18 |
2011-01-18 | HOLLOW STEEL CARRIER | 1799.75 | 1800.25 | 17 | N/A | 2011-03-18 |
2011-01-18 | HOLLOW STEEL CARRIER | 1745.75 | 1746.25 | 17 | N/A | 2011-03-18 |
2011-01-18 | HOLLOW STEEL CARRIER | 1691.75 | 1692.25 | 17 | N/A | 2011-03-18 |
2011-01-18 | HOLLOW STEEL CARRIER | 1624.75 | 1625.25 | 17 | N/A | 2011-03-18 |
2011-01-18 | HOLLOW STEEL CARRIER | 1570.75 | 1571.25 | 17 | N/A | 2011-03-18 |
2011-01-18 | HOLLOW STEEL CARRIER | 1516.75 | 1517.25 | 17 | N/A | 2011-03-18 |
2011-01-18 | HOLLOW STEEL CARRIER | 1448.75 | 1449.25 | 17 | N/A | 2011-03-18 |
2011-01-18 | HOLLOW STEEL CARRIER | 1394.75 | 1395.25 | 17 | N/A | 2011-03-18 |
2011-01-18 | HOLLOW STEEL CARRIER | 1340.75 | 1341.25 | 17 | N/A | 2011-03-18 |
2011-01-18 | HOLLOW STEEL CARRIER | 1273.75 | 1274.25 | 17 | N/A | 2011-03-18 |
2011-01-18 | HOLLOW STEEL CARRIER | 1219.75 | 1220.25 | 17 | N/A | 2011-03-18 |
For data sources see[4]
Start Date | Treatment Type | Treatment Fluid | Treatment Amount | Additive Type | Agent Type | Agent Amount |
---|---|---|---|---|---|---|
2011-02-12 | FRAC | N/A | 20/40 | SAND | 3.6 | |
2011-02-13 | FRAC | N/A | 20/40 | SAND | 3.0 | |
2011-02-13 | FRAC | N/A | 20/40 | SAND | 3.0 | |
2011-02-13 | FRAC | N/A | 20/40 | SAND | 5.0 | |
2011-02-13 | FRAC | N/A | 20/40 | SAND | 5.0 | |
2011-02-14 | FRAC | N/A | 20/40 | SAND | 5.0 | |
2011-02-14 | FRAC | N/A | 20/40 | SAND | 5.0 | |
2011-02-14 | FRAC | N/A | 20/40 | SAND | 5.0 | |
2011-02-14 | FRAC | N/A | 20/40 | SAND | 3.0 | |
2011-02-14 | FRAC | N/A | 20/40 | SAND | 3.0 | |
2011-02-12 | FRAC | N/A | 20/40 | SAND | 5.0 | |
2011-02-12 | FRAC | N/A | 20/40 | SAND | 5.0 | |
2011-02-12 | FRAC | N/A | 20/40 | SAND | 5.0 | |
2011-02-12 | FRAC | N/A | 20/40 | SAND | 5.0 | |
2011-02-13 | FRAC | N/A | 20/40 | SAND | 5.0 | |
2011-02-13 | FRAC | N/A | 20/40 | SAND | 3.0 | |
2011-02-13 | FRAC | N/A | 20/40 | SAND | 3.0 | |
2011-02-13 | FRAC | N/A | 20/40 | SAND | 3.0 |
For data sources see[5]
Period | Operator Name | Oil Quantity (m3) | Oil Production Days | GSD Quantity (m3) |
---|---|---|---|---|
2014 | Tundra Oil & Gas Limited | 782.20 | 0 | 0.00 |
2015 | Tundra Oil & Gas Limited | 413.50 | 0 | 0.00 |
2016 | Tundra Oil & Gas Limited | 1,002.90 | 0 | 0.00 |
2017 | Tundra Oil & Gas Limited | 815.90 | 0 | 0.00 |
2018 | Tundra Oil & Gas Limited | 713.50 | 0 | 0.00 |
2019 | Tundra Oil & Gas Limited | 108.80 | 0 | 0.00 |
2020 | Tundra Oil & Gas Limited | 0.00 | 0 | 0.00 |
For data sources see[6]
Period | Operator | H2O Quantity (m3) | H20 Waste Production Days | Gas Quantity (m3) | Gas Waste Production Days | CO2 Quantity (m3) | SSW Quantity (m3) |
---|---|---|---|---|---|---|---|
2014 | Tundra Oil & Gas Limited | 1,193.50 | 336 | 0.00 | 0 | 0.00 | 0.00 |
2015 | Tundra Oil & Gas Limited | 816.30 | 334 | 0.00 | 0 | 0.00 | 0.00 |
2016 | Tundra Oil & Gas Limited | 2,799.80 | 344 | 0.00 | 0 | 0.00 | 0.00 |
2017 | Tundra Oil & Gas Limited | 1,506.20 | 331 | 0.00 | 0 | 0.00 | 0.00 |
2018 | Tundra Oil & Gas Limited | 1,354.10 | 341 | 0.00 | 0 | 0.00 | 0.00 |
2019 | Tundra Oil & Gas Limited | 263.20 | 71 | 0.00 | 0 | 0.00 | 0.00 |
2020 | Tundra Oil & Gas Limited | 0.00 | 0 | 0.00 | 0 | 0.00 | 0.00 |
For data sources see[7]