If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 100.14-20-001-27W1 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.05678649,"lon":-101.07321402,"icon":""}]} |
Well Name: Tundra Coulter HZNTL | |
Country: Canada | |
Province: Manitoba | |
Township: 001 | |
Meridian: W1 | |
Range: 27 | |
Section: 19 | |
Division: Division No. 5 | |
Subdivision: Two Borders | |
Operator Name: Tundra Oil & Gas Limited | |
License Status: Capable Of Oil Production | |
Spud Date: 2010-08-20 | |
License Date: 2010-08-06 | |
Well Total Depth: 1845.00 | |
Latitude: 49.05678649 | |
Longitude: -101.07321402 |
For data sources see[1]
Date | Event |
---|---|
2010-08-06 | Location |
2010-08-20 | Surface Casing Set |
2010-08-23 | Drilling Ahead |
2010-08-25 | Waiting On Service Rig |
2010-08-29 | Completing |
2010-09-06 | Capable Of Oil Production |
For data sources see[2]
Spud Date | Contractor | Rig Number |
---|---|---|
2010-08-20 | Precision Drilling | 195 |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots | Shot Volume (m3) | Last Modified |
---|---|---|---|---|---|---|
2010-08-30 | HOLLOW STEEL CARRIER | 1817.00 | 1818.00 | 9 | N/A | 2011-04-06 |
2010-08-30 | HOLLOW STEEL CARRIER | 1782.00 | 1783.00 | 9 | N/A | 2011-04-06 |
2010-08-30 | HOLLOW STEEL CARRIER | 1749.00 | 1750.00 | 9 | N/A | 2011-04-06 |
2010-08-30 | HOLLOW STEEL CARRIER | 1714.00 | 1715.00 | 9 | N/A | 2011-04-06 |
2010-08-30 | HOLLOW STEEL CARRIER | 1682.00 | 1683.00 | 9 | N/A | 2011-04-06 |
2010-08-30 | HOLLOW STEEL CARRIER | 1647.00 | 1648.00 | 9 | N/A | 2011-04-06 |
2010-08-30 | HOLLOW STEEL CARRIER | 1615.00 | 1616.00 | 9 | N/A | 2011-04-06 |
2010-08-30 | HOLLOW STEEL CARRIER | 1580.00 | 1581.00 | 9 | N/A | 2011-04-06 |
2010-08-30 | HOLLOW STEEL CARRIER | 1548.00 | 1549.00 | 9 | N/A | 2011-04-06 |
2010-08-30 | HOLLOW STEEL CARRIER | 1513.00 | 1514.00 | 9 | N/A | 2011-04-06 |
2010-08-30 | HOLLOW STEEL CARRIER | 1475.00 | 1476.00 | 9 | N/A | 2011-04-06 |
2010-08-30 | HOLLOW STEEL CARRIER | 1434.00 | 1435.00 | 9 | N/A | 2011-04-06 |
2010-08-30 | HOLLOW STEEL CARRIER | 1394.00 | 1395.00 | 9 | N/A | 2011-04-06 |
2010-08-30 | HOLLOW STEEL CARRIER | 1354.00 | 1355.00 | 9 | N/A | 2011-04-06 |
2010-08-30 | HOLLOW STEEL CARRIER | 1314.00 | 1315.00 | 9 | N/A | 2011-04-06 |
2010-08-30 | HOLLOW STEEL CARRIER | 1274.00 | 1275.00 | 9 | N/A | 2011-04-06 |
2010-08-30 | HOLLOW STEEL CARRIER | 1234.00 | 1235.00 | 9 | N/A | 2011-04-06 |
2010-08-30 | HOLLOW STEEL CARRIER | 1201.00 | 1202.00 | 9 | N/A | 2011-04-06 |
2010-08-30 | HOLLOW STEEL CARRIER | 1166.00 | 1167.00 | 9 | N/A | 2011-04-06 |
2010-08-30 | HOLLOW STEEL CARRIER | 1132.00 | 1133.00 | 9 | N/A | 2011-04-06 |
For data sources see[4]
Start Date | Treatment Type | Treatment Fluid | Treatment Amount | Additive Type | Agent Type | Agent Amount |
---|---|---|---|---|---|---|
2010-09-01 | FRAC | N/A | 20/40 | SAND | 4.1 | |
2010-09-02 | FRAC | N/A | 20/40 | SAND | 4.1 | |
2010-09-02 | FRAC | N/A | 20/40 | SAND | 4.1 | |
2010-09-02 | FRAC | N/A | 20/40 | SAND | 4.1 | |
2010-09-02 | FRAC | N/A | 20/40 | SAND | 4.1 | |
2010-09-02 | FRAC | N/A | 20/40 | SAND | 4.1 | |
2010-09-01 | FRAC | N/A | 20/40 | SAND | 4.1 | |
2010-09-01 | FRAC | N/A | 20/40 | SAND | 4.1 | |
2010-09-01 | FRAC | N/A | 20/40 | SAND | 3.9 | |
2010-09-02 | FRAC | N/A | 20/40 | SAND | 4.1 | |
2010-09-02 | FRAC | N/A | 20/40 | SAND | 4.1 | |
2010-09-02 | FRAC | N/A | 20/40 | SAND | 4.1 | |
2010-09-02 | FRAC | N/A | 20/40 | SAND | 4.1 | |
2010-09-02 | FRAC | N/A | 20/40 | SAND | 4.1 |
For data sources see[5]
Period | Operator Name | Oil Quantity (m3) | Oil Production Days | GSD Quantity (m3) |
---|---|---|---|---|
2014 | Tundra Oil & Gas Limited | 532.90 | 0 | 0.00 |
2015 | Tundra Oil & Gas Limited | 257.10 | 0 | 0.00 |
2016 | Tundra Oil & Gas Limited | 154.60 | 0 | 0.00 |
2017 | Tundra Oil & Gas Limited | 90.50 | 0 | 0.00 |
2018 | Tundra Oil & Gas Limited | 198.00 | 0 | 0.00 |
2019 | Tundra Oil & Gas Limited | 48.30 | 0 | 0.00 |
2020 | Tundra Oil & Gas Limited | 25.50 | 0 | 0.00 |
For data sources see[6]
Period | Operator | H2O Quantity (m3) | H20 Waste Production Days | Gas Quantity (m3) | Gas Waste Production Days | CO2 Quantity (m3) | SSW Quantity (m3) |
---|---|---|---|---|---|---|---|
2014 | Tundra Oil & Gas Limited | 273.60 | 328 | 22.20 | 328 | 0.00 | 0.00 |
2015 | Tundra Oil & Gas Limited | 221.00 | 274 | 10.50 | 274 | 0.00 | 0.00 |
2016 | Tundra Oil & Gas Limited | 85.50 | 361 | 10.30 | 361 | 0.00 | 0.00 |
2017 | Tundra Oil & Gas Limited | 63.90 | 355 | 11.40 | 710 | 0.00 | 0.00 |
2018 | Tundra Oil & Gas Limited | 285.90 | 356 | 14.40 | 712 | 0.00 | 0.00 |
2019 | Tundra Oil & Gas Limited | 26.80 | 82 | 3.60 | 430 | 0.00 | 0.00 |
2020 | Tundra Oil & Gas Limited | 8.30 | 60 | 0.00 | 60 | 0.00 | 0.00 |
For data sources see[7]