If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 102.03-20-002-29W1 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.13753848,"lon":-101.34762954,"icon":""}]} |
Well Name: South Pierson Unit No. 2 HZNTL | |
Country: Canada | |
Province: Manitoba | |
Township: 002 | |
Meridian: W1 | |
Range: 29 | |
Section: 19 | |
Division: Division No. 5 | |
Subdivision: Two Borders | |
Operator Name: Canadian Natural Resources Limited | |
License Status: Capable Of Oil Production | |
Spud Date: 2011-08-05 | |
License Date: 2011-06-02 | |
Well Total Depth: 2125.00 | |
Latitude: 49.13753848 | |
Longitude: -101.34762954 |
For data sources see[1]
Date | Event |
---|---|
2011-06-02 | Location |
2011-10-03 | Drilling Ahead |
2011-10-06 | Waiting On Service Rig |
2011-10-08 | Completing |
2011-11-01 | Capable Of Oil Production |
For data sources see[2]
Spud Date | Contractor | Rig Number |
---|---|---|
2011-08-05 | Precision Drilling | 120 |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots | Shot Volume (m3) | Last Modified |
---|---|---|---|---|---|---|
LINER PORT | 2105.30 | 2105.60 | 0 | N/A | 2011-12-31 | |
LINER PORT | 2044.80 | 2045.10 | 0 | N/A | 2011-12-31 | |
LINER PORT | 1984.70 | 1985.00 | 0 | N/A | 2011-12-31 | |
LINER PORT | 1924.50 | 1924.80 | 0 | N/A | 2011-12-31 | |
LINER PORT | 1865.90 | 1866.20 | 0 | N/A | 2011-12-31 | |
LINER PORT | 1805.80 | 1806.00 | 0 | N/A | 2011-12-31 | |
LINER PORT | 1745.30 | 1745.60 | 0 | N/A | 2011-12-31 | |
LINER PORT | 1688.00 | 1688.30 | 0 | N/A | 2011-12-31 | |
LINER PORT | 1629.70 | 1630.00 | 0 | N/A | 2011-12-31 | |
LINER PORT | 1569.30 | 1569.50 | 0 | N/A | 2011-12-31 | |
LINER PORT | 1508.70 | 1508.90 | 0 | N/A | 2011-12-31 | |
LINER PORT | 1448.10 | 1448.40 | 0 | N/A | 2011-12-31 | |
LINER PORT | 1389.50 | 1389.80 | 0 | N/A | 2011-12-31 | |
LINER PORT | 1329.10 | 1329.40 | 0 | N/A | 2011-12-31 | |
LINER PORT | 1269.40 | 1269.70 | 0 | N/A | 2011-12-31 | |
LINER PORT | 1208.90 | 1209.20 | 0 | N/A | 2011-12-31 |
For data sources see[4]
Start Date | Treatment Type | Treatment Fluid | Treatment Amount | Additive Type | Agent Type | Agent Amount |
---|---|---|---|---|---|---|
2011-10-15 | FRAC | N/A | 20/40 | SAND | 7.0 | |
2011-10-16 | FRAC | N/A | 20/40 | SAND | 7.0 | |
2011-10-16 | FRAC | N/A | 20/40 | SAND | 7.0 | |
2011-10-16 | FRAC | N/A | 20/40 | SAND | 7.0 | |
2011-10-16 | FRAC | N/A | 20/40 | SAND | 7.0 | |
2011-10-16 | FRAC | N/A | 20/40 | SAND | 5.0 | |
2011-10-16 | FRAC | N/A | 20/40 | SAND | 7.0 | |
2011-10-16 | FRAC | N/A | 20/40 | SAND | 7.0 | |
2011-10-15 | FRAC | N/A | 20/40 | SAND | 7.0 | |
2011-10-15 | FRAC | N/A | 20/40 | SAND | 7.0 | |
2011-10-15 | FRAC | N/A | 20/40 | SAND | 7.0 | |
2011-10-16 | FRAC | N/A | 20/40 | SAND | 7.0 | |
2011-10-16 | FRAC | N/A | 20/40 | SAND | 7.0 | |
2011-10-16 | FRAC | N/A | 20/40 | SAND | 7.0 | |
2011-10-16 | FRAC | N/A | 20/40 | SAND | 7.0 | |
2011-10-16 | FRAC | N/A | 20/40 | SAND | 7.0 |
For data sources see[5]
Period | Operator Name | Oil Quantity (m3) | Oil Production Days | GSD Quantity (m3) |
---|---|---|---|---|
2014 | Canadian Natural Resources Limited | 1,083.00 | 0 | 15.00 |
2015 | Canadian Natural Resources Limited | 912.80 | 0 | 36.00 |
2016 | Canadian Natural Resources Limited | 1,681.70 | 0 | 50.80 |
2017 | Canadian Natural Resources Limited | 1,481.10 | 0 | 24.30 |
2018 | Canadian Natural Resources Limited | 1,027.70 | 0 | 137.70 |
2019 | Canadian Natural Resources Limited | 122.90 | 0 | 4.50 |
2020 | Canadian Natural Resources Limited | 41.80 | 0 | 0.00 |
For data sources see[6]
Period | Operator | H2O Quantity (m3) | H20 Waste Production Days | Gas Quantity (m3) | Gas Waste Production Days | CO2 Quantity (m3) | SSW Quantity (m3) |
---|---|---|---|---|---|---|---|
2014 | Canadian Natural Resources Limited | 1,670.90 | 350 | 22.20 | 350 | 0.00 | 0.00 |
2015 | Canadian Natural Resources Limited | 3,024.80 | 364 | 38.20 | 364 | 0.00 | 0.00 |
2016 | Canadian Natural Resources Limited | 3,620.20 | 349 | 67.60 | 349 | 0.00 | 0.00 |
2017 | Canadian Natural Resources Limited | 2,610.70 | 365 | 78.20 | 729 | 0.00 | 0.00 |
2018 | Canadian Natural Resources Limited | 4,168.00 | 363 | 405.20 | 725 | 0.00 | 0.00 |
2019 | Canadian Natural Resources Limited | 1,213.80 | 85 | 26.50 | 416 | 0.00 | 0.00 |
2020 | Canadian Natural Resources Limited | 209.20 | 40 | 2.60 | 40 | 0.00 | 0.00 |
For data sources see[7]