If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 102.04-03-010-28W1 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.79899997,"lon":-101.19155711,"icon":""}]} |
Well Name: Daly Unit No. 12 HZNTL | |
Country: Canada | |
Province: Manitoba | |
Township: 010 | |
Meridian: W1 | |
Range: 28 | |
Section: 03 | |
Division: Division No. 6 | |
Subdivision: Wallace-Woodworth | |
Operator Name: Tundra Oil & Gas Limited | |
License Status: Capable Of Oil Production | |
Spud Date: 2017-01-23 | |
License Date: 2016-12-19 | |
Well Total Depth: 2117.00 | |
Latitude: 49.79899997 | |
Longitude: -101.19155711 |
For data sources see[1]
Date | Event |
---|---|
2016-12-19 | Location |
2017-01-30 | Drilling Ahead |
2017-02-01 | Waiting On Service Rig |
2017-03-10 | Completing |
2017-03-11 | Capable Of Oil Production |
For data sources see[2]
Spud Date | Contractor | Rig Number |
---|---|---|
2017-01-23 | Ensign Drilling Inc. | 12 |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots | Shot Volume (m3) | Last Modified |
---|---|---|---|---|---|---|
2017-02-19 | 2103.90 | 2113.90 | 0 | N/A | 2019-03-27 | |
2017-02-19 | 2057.90 | 2067.90 | 0 | N/A | 2019-03-27 | |
2017-02-19 | 2031.90 | 2041.90 | 0 | N/A | 2019-03-27 | |
2017-02-19 | 1999.90 | 2009.90 | 0 | N/A | 2019-03-27 | |
2017-02-19 | 1959.68 | 1969.68 | 0 | N/A | 2019-03-27 | |
2017-02-19 | 1923.78 | 1933.78 | 0 | N/A | 2019-03-27 | |
2017-02-19 | 1887.60 | 1897.60 | 0 | N/A | 2019-03-27 | |
2017-02-20 | 1852.15 | 1862.15 | 0 | N/A | 2019-03-27 | |
2017-02-20 | 1816.74 | 1826.74 | 0 | N/A | 2019-03-27 | |
2017-02-20 | 1781.05 | 1791.05 | 0 | N/A | 2019-03-27 | |
2017-02-20 | 1745.20 | 1755.20 | 0 | N/A | 2019-03-27 | |
2017-02-20 | 1708.90 | 1718.90 | 0 | N/A | 2019-03-27 | |
2017-02-20 | 1673.20 | 1683.20 | 0 | N/A | 2019-03-27 | |
2017-02-20 | 1636.90 | 1646.90 | 0 | N/A | 2019-03-27 | |
2017-02-20 | 1600.88 | 1610.88 | 0 | N/A | 2019-03-27 | |
2017-02-20 | 1564.62 | 1574.62 | 0 | N/A | 2019-03-27 | |
2017-02-20 | 1528.40 | 1538.40 | 0 | N/A | 2019-03-27 | |
2017-02-20 | 1492.50 | 1502.50 | 0 | N/A | 2019-03-27 | |
2017-02-20 | 1456.40 | 1466.40 | 0 | N/A | 2019-03-27 | |
2017-02-21 | 1420.40 | 1430.40 | 0 | N/A | 2019-03-27 | |
2017-02-21 | 1384.30 | 1394.30 | 0 | N/A | 2019-03-27 | |
2017-02-21 | 1348.20 | 1358.20 | 0 | N/A | 2019-03-27 | |
2017-02-21 | 1312.10 | 1322.10 | 0 | N/A | 2019-03-27 | |
2017-02-21 | 1239.60 | 1249.60 | 0 | N/A | 2019-03-27 | |
2017-02-21 | 1203.50 | 1213.50 | 0 | N/A | 2019-03-27 | |
2017-02-21 | 1167.30 | 1177.30 | 0 | N/A | 2019-03-27 | |
2017-02-21 | 1131.10 | 1141.10 | 0 | N/A | 2019-03-27 | |
2017-02-21 | 1094.90 | 1104.90 | 0 | N/A | 2019-03-27 | |
2017-02-21 | 1058.80 | 1068.80 | 0 | N/A | 2019-03-27 | |
2017-02-21 | 1023.30 | 1033.30 | 0 | N/A | 2019-03-27 | |
2017-02-21 | 987.65 | 997.65 | 0 | N/A | 2019-03-27 | |
2017-02-21 | 951.78 | 961.78 | 0 | N/A | 2019-03-27 | |
2017-02-21 | 915.70 | 925.70 | 0 | N/A | 2019-03-27 | |
2017-02-21 | 881.07 | 891.07 | 0 | N/A | 2019-03-27 |
For data sources see[4]
Start Date | Treatment Type | Treatment Fluid | Treatment Amount | Additive Type | Agent Type | Agent Amount |
---|---|---|---|---|---|---|
2017-02-19 | FRAC | 15 % HCL | 2.0 | 20/40 | SAND | N/A |
2017-02-20 | FRAC | 15 % HCL | 1.5 | 20/40 | SAND | 3.0 |
2017-02-20 | FRAC | 15 % HCL | 1.5 | 20/40 | SAND | 2.5 |
2017-02-20 | FRAC | 15 % HCL | 5.0 | 20/40 | SAND | 0.5 |
2017-02-20 | FRAC | 15 % HCL | 2.0 | 20/40 | SAND | 3.0 |
2017-02-20 | FRAC | 15 % HCL | 1.5 | 20/40 | SAND | 3.0 |
2017-02-20 | FRAC | 15 % HCL | 1.5 | 20/40 | SAND | 3.0 |
2017-02-20 | FRAC | 15 % HCL | 1.5 | 20/40 | SAND | 3.0 |
2017-02-20 | FRAC | 15 % HCL | 2.0 | 20/40 | SAND | 3.0 |
2017-02-20 | FRAC | 15 % HCL | 2.0 | 20/40 | SAND | 3.0 |
2017-02-20 | FRAC | 15 % HCL | 1.0 | 20/40 | SAND | 3.0 |
2017-02-19 | FRAC | 15 % HCL | 1.0 | 20/40 | SAND | 1.0 |
2017-02-21 | FRAC | 15 % HCL | 1.0 | 20/40 | SAND | 3.0 |
2017-02-21 | FRAC | 15 % HCL | 1.0 | 20/40 | SAND | 3.0 |
2017-02-21 | FRAC | 15 % HCL | 1.0 | 20/40 | SAND | 3.0 |
2017-02-21 | FRAC | 15 % HCL | 1.0 | 20/40 | SAND | 3.0 |
2017-02-21 | FRAC | 15 % HCL | 2.0 | 20/40 | SAND | 1.0 |
2017-02-21 | FRAC | 15 % HCL | 1.5 | 20/40 | SAND | 0.5 |
2017-02-21 | FRAC | 15 % HCL | 1.0 | 20/40 | SAND | 1.0 |
2017-02-21 | FRAC | 15 % HCL | 1.0 | 20/40 | SAND | 3.0 |
2017-02-21 | FRAC | 15 % HCL | 1.0 | 20/40 | SAND | 3.0 |
2017-02-21 | FRAC | 15 % HCL | 1.0 | 20/40 | SAND | 3.0 |
2017-02-19 | FRAC | 15 % HCL | 2.5 | 20/40 | SAND | 1.0 |
2017-02-21 | FRAC | 15 % HCL | 1.0 | 20/40 | SAND | 1.0 |
2017-02-21 | FRAC | 15 % HCL | 1.0 | 20/40 | SAND | 1.0 |
2017-02-21 | FRAC | 15 % HCL | 1.0 | 20/40 | SAND | 1.9 |
2017-02-21 | FRAC | 15 % HCL | 1.0 | 20/40 | SAND | 1.2 |
2017-02-21 | FRAC | 15 % HCL | 1.0 | 20/40 | SAND | 3.0 |
2017-02-21 | FRAC | 15 % HCL | 1.5 | 20/40 | SAND | 3.0 |
2017-02-19 | FRAC | 15 % HCL | 3.0 | 20/40 | SAND | N/A |
2017-02-19 | FRAC | 15 % HCL | 3.0 | 20/40 | SAND | 3.0 |
2017-02-19 | FRAC | 15 % HCL | 1.0 | 20/40 | SAND | 3.0 |
2017-02-19 | FRAC | 15 % HCL | 2.0 | 20/40 | SAND | 3.0 |
2017-02-20 | FRAC | 15 % HCL | 2.0 | 20/40 | SAND | 2.0 |
2017-02-20 | FRAC | 15 % HCL | 2.0 | 20/40 | SAND | 3.0 |
For data sources see[5]
Period | Operator Name | Oil Quantity (m3) | Oil Production Days | GSD Quantity (m3) |
---|---|---|---|---|
2017 | Tundra Oil & Gas Limited | 4,138.30 | 0 | 0.00 |
2018 | Tundra Oil & Gas Limited | 4,127.50 | 0 | 0.00 |
2019 | Tundra Oil & Gas Limited | 892.00 | 0 | 0.00 |
2020 | Tundra Oil & Gas Limited | 275.20 | 0 | 0.00 |
For data sources see[6]
Period | Operator | H2O Quantity (m3) | H20 Waste Production Days | Gas Quantity (m3) | Gas Waste Production Days | CO2 Quantity (m3) | SSW Quantity (m3) |
---|---|---|---|---|---|---|---|
2017 | Tundra Oil & Gas Limited | 6,252.90 | 259 | 0.00 | 0 | 0.00 | 0.00 |
2018 | Tundra Oil & Gas Limited | 5,407.70 | 353 | 0.00 | 0 | 0.00 | 0.00 |
2019 | Tundra Oil & Gas Limited | 1,037.10 | 90 | 0.00 | 0 | 0.00 | 0.00 |
2020 | Tundra Oil & Gas Limited | 334.90 | 60 | 0.00 | 0 | 0.00 | 0.00 |
For data sources see[7]