X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

102.05-15-009-28W1

Well Details

Well ID: 102.05-15-009-28W1
Loading map...
Well Name: Tundra Daly Sinclair HZNTL
Country: Canada
Province: Manitoba
Township: 009
Meridian: W1
Range: 28
Section: 14
Division: Division No. 6
Subdivision: Pipestone
Operator Name: Tundra Oil & Gas Limited
License Status: Capable Of Oil Production
Spud Date: 2015-02-04
License Date: 2015-02-05
Well Total Depth: 2253.50
Latitude: 49.74439874
Longitude: -101.18930351

For data sources see[1]

Well History

Date Event
2015-02-05 Location
2015-02-09 Drilling Ahead
2015-02-16 Waiting On Service Rig
2015-03-09 Completing
2015-03-16 Capable Of Oil Production

For data sources see[2]

Spud Data

Spud Date Contractor Rig Number
2015-02-04 Ensign - Trinidad Drilling Inc. 9

For data sources see[3]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots Shot Volume (m3) Last Modified
2015-03-07 LINER PORT 2234.90 2234.90 0 N/A 2016-01-27
2015-03-07 LINER PORT 2190.70 2190.70 0 N/A 2016-01-27
2015-03-07 LINER PORT 2146.60 2146.60 0 N/A 2016-01-27
2015-03-07 LINER PORT 2102.50 2102.50 0 N/A 2016-01-27
2015-03-07 LINER PORT 2058.40 2058.40 0 N/A 2016-01-27
2015-03-07 LINER PORT 2014.30 2014.30 0 N/A 2016-01-27
2015-03-07 LINER PORT 1970.10 1970.10 0 N/A 2016-01-27
2015-03-07 LINER PORT 1926.00 1926.00 0 N/A 2016-01-27
2015-03-07 LINER PORT 1881.80 1881.80 0 N/A 2016-01-27
2015-03-07 LINER PORT 1837.60 1837.60 0 N/A 2016-01-27
2015-03-08 LINER PORT 1793.50 1793.50 0 N/A 2016-01-27
2015-03-08 LINER PORT 1749.50 1749.50 0 N/A 2016-01-27
2015-03-08 LINER PORT 1705.40 1705.40 0 N/A 2016-01-27
2015-03-08 LINER PORT 1661.20 1661.20 0 N/A 2016-01-27
2015-03-08 LINER PORT 1617.00 1617.00 0 N/A 2016-01-27
2015-03-08 LINER PORT 1572.90 1572.90 0 N/A 2016-01-27
2015-03-08 LINER PORT 1528.70 1528.70 0 N/A 2016-01-27
2015-03-08 LINER PORT 1484.60 1484.60 0 N/A 2016-01-27
2015-03-08 LINER PORT 1396.20 1396.20 0 N/A 2016-01-27
2015-03-08 LINER PORT 1308.00 1308.00 0 N/A 2016-01-27
2015-03-08 LINER PORT 1263.90 1263.90 0 N/A 2016-01-27
2015-03-09 LINER PORT 1175.50 1175.50 0 N/A 2016-01-27
2015-03-09 LINER PORT 1131.40 1131.40 0 N/A 2016-01-27
2015-03-09 LINER PORT 1087.20 1087.20 0 N/A 2016-01-27
2015-03-09 LINER PORT 1043.10 1043.10 0 N/A 2016-01-27
2015-03-09 LINER PORT 998.90 998.90 0 N/A 2016-01-27
2015-03-09 LINER PORT 954.90 954.90 0 N/A 2016-01-27
2015-03-09 LINER PORT 910.70 910.70 0 N/A 2016-01-27
2015-03-09 LINER PORT 866.60 866.60 0 N/A 2016-01-27

For data sources see[4]

Well Treatment Data

Start Date Treatment Type Treatment Fluid Treatment Amount Additive Type Agent Type Agent Amount
2015-03-07 FRAC N/A 20/40 SAND 15.0
2015-03-08 FRAC N/A 20/40 SAND 15.0
2015-03-08 FRAC N/A 20/40 SAND 15.0
2015-03-08 FRAC N/A 20/40 SAND 15.0
2015-03-08 FRAC N/A 20/40 SAND 15.0
2015-03-08 FRAC N/A 20/40 SAND 15.0
2015-03-08 FRAC N/A 20/40 SAND 15.0
2015-03-08 FRAC N/A 20/40 SAND 15.0
2015-03-08 FRAC N/A 20/40 SAND 15.0
2015-03-08 FRAC N/A 20/40 SAND 15.0
2015-03-08 FRAC N/A 20/40 SAND 15.0
2015-03-07 FRAC N/A 20/40 SAND 15.0
2015-03-08 FRAC N/A 20/40 SAND 15.0
2015-03-08 FRAC N/A 20/40 SAND 15.0
2015-03-08 FRAC N/A 20/40 SAND 15.0
2015-03-08 FRAC N/A 20/40 SAND 15.0
2015-03-08 FRAC N/A 20/40 SAND 15.0
2015-03-09 FRAC N/A 20/40 SAND 15.0
2015-03-09 FRAC N/A 20/40 SAND 15.0
2015-03-09 FRAC N/A 20/40 SAND 15.0
2015-03-09 FRAC N/A 20/40 SAND 15.0
2015-03-09 FRAC N/A 20/40 SAND 15.0
2015-03-07 FRAC N/A 20/40 SAND 15.0
2015-03-09 FRAC N/A 20/40 SAND 15.0
2015-03-09 FRAC N/A 20/40 SAND 15.0
2015-03-09 FRAC N/A 20/40 SAND 15.0
2015-03-07 FRAC N/A 20/40 SAND 15.0
2015-03-07 FRAC N/A 20/40 SAND 15.0
2015-03-07 FRAC N/A 20/40 SAND 15.0
2015-03-07 FRAC N/A 20/40 SAND 15.0
2015-03-07 FRAC N/A 20/40 SAND 15.0
2015-03-07 FRAC N/A 20/40 SAND 15.0

For data sources see[5]

Production Data

Period Operator Name Oil Quantity (m3) Oil Production Days GSD Quantity (m3)
2015 Tundra Oil & Gas Limited 4,229.80 0 0.00
2016 Tundra Oil & Gas Limited 3,694.20 0 0.00
2017 Tundra Oil & Gas Limited 1,937.40 0 0.00
2018 Tundra Oil & Gas Limited 306.20 0 0.00
2019 Tundra Oil & Gas Limited 58.40 0 0.00
2020 Tundra Oil & Gas Limited 0.00 0 0.00

For data sources see[6]

Waste Data

Period Operator H2O Quantity (m3) H20 Waste Production Days Gas Quantity (m3) Gas Waste Production Days CO2 Quantity (m3) SSW Quantity (m3)
2015 Tundra Oil & Gas Limited 10,689.00 279 0.00 0 0.00 0.00
2016 Tundra Oil & Gas Limited 15,714.00 362 0.00 0 0.00 0.00
2017 Tundra Oil & Gas Limited 20,887.80 356 0.00 0 0.00 0.00
2018 Tundra Oil & Gas Limited 7,250.20 109 0.00 0 0.00 0.00
2019 Tundra Oil & Gas Limited 2,758.70 46 0.00 0 0.00 0.00
2020 Tundra Oil & Gas Limited 0.00 0 0.00 0 0.00 0.00

For data sources see[7]

References

  1. "Digital Data - Well". Province of Manitoba: Growth, Enterprise and Trade Branch. 2020-06-12. Retrieved 2020-07-30. 
  2. "Digital Data - Status History". Province of Manitoba: Growth, Enterprise and Trade Branch. 2020-06-12. Retrieved 2020-07-30. 
  3. "Digital Data - Drilling Rigs". Province of Manitoba: Growth, Enterprise and Trade Branch. 2020-06-12. Retrieved 2020-07-30. 
  4. "Digital Data - Perfs". Province of Manitoba: Growth, Enterprise and Trade Branch. 2020-06-12. Retrieved 2020-07-30. 
  5. "Digital Data - Well Treatments". Province of Manitoba: Growth, Enterprise and Trade Branch. 2020-06-12. Retrieved 2020-07-30. 
  6. "Production Reports". Province of Manitoba: Growth, Enterprise and Trade Branch. 2020-05-24. Retrieved 2020-07-30. 
  7. "Production Reports". Province of Manitoba: Growth, Enterprise and Trade Branch. 2020-05-24. Retrieved 2020-07-30.