If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 102.05-19-002-29W1 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.13762845,"lon":-101.34762967,"icon":""}]} |
Well Name: South Pierson Unit No. 2 HZNTL | |
Country: Canada | |
Province: Manitoba | |
Township: 002 | |
Meridian: W1 | |
Range: 29 | |
Section: 19 | |
Division: Division No. 5 | |
Subdivision: Two Borders | |
Operator Name: Canadian Natural Resources Limited | |
License Status: Capable Of Oil Production | |
Spud Date: 2011-07-28 | |
License Date: 2011-06-02 | |
Well Total Depth: 1873.00 | |
Latitude: 49.13762845 | |
Longitude: -101.34762967 |
For data sources see[1]
Date | Event |
---|---|
2011-06-02 | Location |
2011-09-26 | Drilling Ahead |
2011-09-29 | Waiting On Service Rig |
2011-10-08 | Completing |
2011-11-01 | Capable Of Oil Production |
For data sources see[2]
Spud Date | Contractor | Rig Number |
---|---|---|
2011-07-28 | Precision Drilling | 120 |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots | Shot Volume (m3) | Last Modified |
---|---|---|---|---|---|---|
LINER PORT | 1853.30 | 1853.60 | 0 | N/A | 2011-12-31 | |
LINER PORT | 1791.80 | 1792.00 | 0 | N/A | 2011-12-31 | |
LINER PORT | 1731.40 | 1731.70 | 0 | N/A | 2011-12-31 | |
LINER PORT | 1672.60 | 1672.90 | 0 | N/A | 2011-12-31 | |
LINER PORT | 1600.60 | 1600.90 | 0 | N/A | 2011-12-31 | |
LINER PORT | 1540.60 | 1540.90 | 0 | N/A | 2011-12-31 | |
LINER PORT | 1480.10 | 1480.40 | 0 | N/A | 2011-12-31 | |
LINER PORT | 1419.80 | 1420.10 | 0 | N/A | 2011-12-31 | |
LINER PORT | 1360.90 | 1361.10 | 0 | N/A | 2011-12-31 | |
LINER PORT | 1301.60 | 1301.90 | 0 | N/A | 2011-12-31 | |
LINER PORT | 1228.30 | 1228.50 | 0 | N/A | 2011-12-31 | |
LINER PORT | 1181.70 | 1182.00 | 0 | N/A | 2011-12-31 |
For data sources see[4]
Start Date | Treatment Type | Treatment Fluid | Treatment Amount | Additive Type | Agent Type | Agent Amount |
---|---|---|---|---|---|---|
2011-10-14 | FRAC | N/A | 20/40 | SAND | 7.0 | |
2011-10-15 | FRAC | N/A | 20/40 | SAND | 7.0 | |
2011-10-15 | FRAC | N/A | 20/40 | SAND | 7.0 | |
2011-10-15 | FRAC | N/A | 20/40 | SAND | 7.0 | |
2011-10-14 | FRAC | N/A | 20/40 | SAND | 7.0 | |
2011-10-14 | FRAC | N/A | 20/40 | SAND | 4.0 | |
2011-10-14 | FRAC | N/A | 20/40 | SAND | 7.0 | |
2011-10-14 | FRAC | N/A | 20/40 | SAND | 7.0 | |
2011-10-14 | FRAC | N/A | 20/40 | SAND | 7.0 | |
2011-10-14 | FRAC | N/A | 20/40 | SAND | 7.0 | |
2011-10-14 | FRAC | N/A | 20/40 | SAND | 7.0 | |
2011-10-14 | FRAC | N/A | 20/40 | SAND | 7.0 |
For data sources see[5]
Period | Operator Name | Oil Quantity (m3) | Oil Production Days | GSD Quantity (m3) |
---|---|---|---|---|
2014 | Canadian Natural Resources Limited | 552.90 | 0 | 19.20 |
2015 | Canadian Natural Resources Limited | 540.70 | 0 | 29.20 |
2016 | Canadian Natural Resources Limited | 909.90 | 0 | 30.70 |
2017 | Canadian Natural Resources Limited | 662.70 | 0 | 44.00 |
2018 | Canadian Natural Resources Limited | 467.30 | 0 | 25.40 |
2019 | Canadian Natural Resources Limited | 124.10 | 0 | 5.90 |
2020 | Canadian Natural Resources Limited | 54.20 | 0 | 0.00 |
For data sources see[6]
Period | Operator | H2O Quantity (m3) | H20 Waste Production Days | Gas Quantity (m3) | Gas Waste Production Days | CO2 Quantity (m3) | SSW Quantity (m3) |
---|---|---|---|---|---|---|---|
2014 | Canadian Natural Resources Limited | 518.10 | 347 | 25.30 | 347 | 0.00 | 0.00 |
2015 | Canadian Natural Resources Limited | 631.30 | 365 | 34.10 | 365 | 0.00 | 0.00 |
2016 | Canadian Natural Resources Limited | 1,361.70 | 356 | 40.70 | 356 | 0.00 | 0.00 |
2017 | Canadian Natural Resources Limited | 1,054.90 | 356 | 133.40 | 710 | 0.00 | 0.00 |
2018 | Canadian Natural Resources Limited | 1,016.80 | 356 | 70.40 | 712 | 0.00 | 0.00 |
2019 | Canadian Natural Resources Limited | 121.30 | 85 | 43.10 | 438 | 0.00 | 0.00 |
2020 | Canadian Natural Resources Limited | 49.80 | 40 | 2.20 | 40 | 0.00 | 0.00 |
For data sources see[7]