If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 102.05-29-008-28W1 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.68597463,"lon":-101.23454755,"icon":""}]} |
Well Name: Ewart Unit No. 3 Prov. HZNTL | |
Country: Canada | |
Province: Manitoba | |
Township: 008 | |
Meridian: W1 | |
Range: 28 | |
Section: 28 | |
Division: Division No. 6 | |
Subdivision: Pipestone | |
Operator Name: Tundra Oil & Gas Limited | |
License Status: Capable Of Oil Production | |
Spud Date: 2010-06-15 | |
License Date: 2010-06-03 | |
Well Total Depth: 2414.00 | |
Latitude: 49.68597463 | |
Longitude: -101.23454755 |
For data sources see[1]
Date | Event |
---|---|
2010-06-03 | Location |
2010-10-25 | Setting Liner |
2010-10-25 | Waiting On Service Rig |
2011-08-08 | Capable Of Oil Production |
For data sources see[2]
Spud Date | Contractor | Rig Number |
---|---|---|
2010-06-15 | Trinidad Drilling Ltd. | 5 |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots | Shot Volume (m3) | Last Modified |
---|---|---|---|---|---|---|
2011-07-24 | 2335.00 | 2345.00 | 0 | N/A | 2019-12-24 | |
2011-07-24 | 2257.00 | 2267.00 | 0 | N/A | 2019-12-24 | |
2011-07-24 | 2200.00 | 2210.00 | 0 | N/A | 2019-12-24 | |
2011-07-24 | 2150.00 | 2160.00 | 0 | N/A | 2019-12-24 | |
2011-07-24 | 2095.00 | 2105.00 | 0 | N/A | 2019-12-24 | |
2011-07-24 | 2044.00 | 2054.00 | 0 | N/A | 2019-12-24 | |
2011-07-24 | 1990.00 | 2000.00 | 0 | N/A | 2019-12-24 | |
2011-07-24 | 1880.00 | 1890.00 | 0 | N/A | 2019-12-24 | |
2011-07-24 | 1935.00 | 1945.00 | 0 | N/A | 2019-12-24 | |
2011-07-24 | 1827.00 | 1837.00 | 0 | N/A | 2019-12-24 | |
2011-07-24 | 1786.00 | 1796.00 | 0 | N/A | 2019-12-24 | |
2011-07-24 | 1730.00 | 1740.00 | 0 | N/A | 2019-12-24 | |
2011-07-24 | 1692.00 | 1702.00 | 0 | N/A | 2019-12-24 | |
2011-07-25 | 1638.00 | 1648.00 | 0 | N/A | 2019-12-24 | |
2011-07-25 | 1584.00 | 1594.00 | 0 | N/A | 2019-12-24 | |
2011-07-25 | 1542.00 | 1552.00 | 0 | N/A | 2019-12-24 | |
2011-07-25 | 1489.00 | 1499.00 | 0 | N/A | 2019-12-24 | |
2011-07-25 | 1440.00 | 1450.00 | 0 | N/A | 2019-12-24 |
For data sources see[4]
Start Date | Treatment Type | Treatment Fluid | Treatment Amount | Additive Type | Agent Type | Agent Amount |
---|---|---|---|---|---|---|
2011-07-24 | FRAC | 15 % HCL | 0.3 | 50/140 | SAND | 3.0 |
2011-07-24 | FRAC | 15 % HCL | 0.3 | 50/140 | SAND | 2.5 |
2011-07-24 | FRAC | 15 % HCL | 0.3 | 50/140 | SAND | 2.5 |
2011-07-24 | FRAC | 15 % HCL | 0.3 | 50/140 | SAND | 2.5 |
2011-07-24 | FRAC | 15 % HCL | 0.3 | 50/140 | SAND | 2.5 |
2011-07-25 | FRAC | 15 % HCL | 0.3 | 50/140 | SAND | 2.5 |
2011-07-25 | FRAC | 15 % HCL | 0.3 | 50/140 | SAND | 2.5 |
2011-07-25 | FRAC | 15 % HCL | 0.3 | 50/140 | SAND | 2.5 |
2011-07-25 | FRAC | 15 % HCL | 0.3 | 50/140 | SAND | 2.5 |
2011-07-25 | FRAC | 15 % HCL | 0.3 | 50/140 | SAND | 2.5 |
2011-07-24 | FRAC | 15 % HCL | 0.3 | 50/140 | SAND | 2.5 |
2011-07-24 | FRAC | 15 % HCL | 0.3 | 50/140 | SAND | 2.5 |
2011-07-24 | FRAC | 15 % HCL | 0.3 | 50/140 | SAND | 2.5 |
2011-07-24 | FRAC | 15 % HCL | 0.3 | 50/140 | SAND | 2.5 |
2011-07-24 | FRAC | 15 % HCL | 0.3 | 50/140 | SAND | 2.5 |
2011-07-24 | FRAC | 15 % HCL | 0.3 | 50/140 | SAND | 2.5 |
2011-07-24 | FRAC | 15 % HCL | 0.3 | 50/140 | SAND | 2.5 |
2011-07-24 | FRAC | 15 % HCL | 0.3 | 50/140 | SAND | 2.5 |
For data sources see[5]
Period | Operator Name | Oil Quantity (m3) | Oil Production Days | GSD Quantity (m3) |
---|---|---|---|---|
2014 | Tundra Oil & Gas Limited | 853.20 | 0 | 0.00 |
2015 | Tundra Oil & Gas Limited | 778.80 | 0 | 0.00 |
2016 | Tundra Oil & Gas Limited | 1,601.00 | 0 | 0.00 |
2017 | Tundra Oil & Gas Limited | 1,994.90 | 0 | 0.00 |
2018 | Tundra Oil & Gas Limited | 1,321.60 | 0 | 0.00 |
2019 | Tundra Oil & Gas Limited | 274.60 | 0 | 0.00 |
2020 | Tundra Oil & Gas Limited | 202.10 | 0 | 0.00 |
For data sources see[6]
Period | Operator | H2O Quantity (m3) | H20 Waste Production Days | Gas Quantity (m3) | Gas Waste Production Days | CO2 Quantity (m3) | SSW Quantity (m3) |
---|---|---|---|---|---|---|---|
2014 | Tundra Oil & Gas Limited | 3,454.40 | 332 | 0.00 | 0 | 0.00 | 0.00 |
2015 | Tundra Oil & Gas Limited | 2,670.80 | 359 | 0.00 | 0 | 0.00 | 0.00 |
2016 | Tundra Oil & Gas Limited | 4,547.80 | 347 | 0.00 | 0 | 0.00 | 0.00 |
2017 | Tundra Oil & Gas Limited | 5,235.10 | 365 | 0.00 | 0 | 0.00 | 0.00 |
2018 | Tundra Oil & Gas Limited | 4,192.20 | 357 | 0.00 | 0 | 0.00 | 0.00 |
2019 | Tundra Oil & Gas Limited | 940.90 | 81 | 0.00 | 0 | 0.00 | 0.00 |
2020 | Tundra Oil & Gas Limited | 735.50 | 60 | 0.00 | 0 | 0.00 | 0.00 |
For data sources see[7]