If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 102.08-12-011-26W1 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.89967983,"lon":-100.90079019,"icon":""}]} |
Well Name: Virden Roselea Unit No. 2 HZNTL | |
Country: Canada | |
Province: Manitoba | |
Township: 011 | |
Meridian: W1 | |
Range: 26 | |
Section: 01 | |
Division: Division No. 6 | |
Subdivision: Wallace-Woodworth | |
Operator Name: Corex Resources Ltd. | |
License Status: Capable Of Oil Production | |
Spud Date: 2014-03-14 | |
License Date: 2014-02-14 | |
Well Total Depth: 1435.50 | |
Latitude: 49.89967983 | |
Longitude: -100.90079019 |
For data sources see[1]
Date | Event |
---|---|
2014-02-14 | Location |
2014-09-22 | Drilling Ahead |
2014-09-25 | Waiting On Service Rig |
2014-10-08 | Completing |
2014-10-18 | Capable Of Oil Production |
For data sources see[2]
Spud Date | Contractor | Rig Number |
---|---|---|
2014-03-14 | Precision Drilling | 205 |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots | Shot Volume (m3) | Last Modified |
---|---|---|---|---|---|---|
2014-09-29 | 741.27 | 744.51 | 0 | N/A | 2017-06-20 | |
2014-09-29 | 786.06 | 789.30 | 0 | N/A | 2017-06-20 | |
2014-09-29 | 830.81 | 834.05 | 0 | N/A | 2017-06-20 | |
2014-09-29 | 875.59 | 878.83 | 0 | N/A | 2017-06-20 | |
2014-09-29 | 920.27 | 923.50 | 0 | N/A | 2017-06-20 | |
2014-09-29 | 965.01 | 968.24 | 0 | N/A | 2017-06-20 | |
2014-09-29 | 1009.74 | 1012.97 | 0 | N/A | 2017-06-20 | |
2014-09-29 | 1054.38 | 1057.62 | 0 | N/A | 2017-06-20 | |
2014-09-29 | 1099.14 | 1102.38 | 0 | N/A | 2017-06-20 | |
2014-09-29 | 1143.64 | 1146.87 | 0 | N/A | 2017-06-20 | |
2014-09-29 | 1188.38 | 1191.62 | 0 | N/A | 2017-06-20 | |
2014-09-29 | 1233.13 | 1236.37 | 0 | N/A | 2017-06-20 | |
2014-09-29 | 1277.88 | 1281.11 | 0 | N/A | 2017-06-20 | |
2014-09-29 | 1322.60 | 1325.84 | 0 | N/A | 2017-06-20 | |
2014-09-29 | 1367.42 | 1370.66 | 0 | N/A | 2017-06-20 | |
2014-09-29 | 1414.84 | 1418.07 | 0 | N/A | 2017-06-20 |
For data sources see[4]
Start Date | Treatment Type | Treatment Fluid | Treatment Amount | Additive Type | Agent Type | Agent Amount |
---|---|---|---|---|---|---|
2014-09-28 | FRAC | 15% HCl | N/A | 20:40 | SAND | 5.0 |
2014-09-29 | FRAC | 15% HCl | N/A | 20:40 | SAND | 5.0 |
2014-09-29 | FRAC | 15% HCl | N/A | 20:40 | SAND | 5.0 |
2014-09-29 | FRAC | 15% HCl | N/A | 20:40 | SAND | 5.0 |
2014-09-29 | FRAC | 15% HCl | N/A | 20:40 | SAND | 5.0 |
2014-09-29 | FRAC | 15% HCl | N/A | 20:40 | SAND | 5.0 |
2014-09-29 | FRAC | 15% HCl | N/A | 20:40 | SAND | 5.0 |
2014-09-29 | FRAC | 15% HCl | N/A | 20:40 | SAND | 5.0 |
2014-09-28 | FRAC | 15% HCl | N/A | 20:40 | SAND | 5.0 |
2014-09-29 | FRAC | 15% HCl | N/A | 20:40 | SAND | 5.0 |
2014-09-29 | FRAC | 15% HCl | N/A | 20:40 | SAND | 5.0 |
2014-09-29 | FRAC | 15% HCl | N/A | 20:40 | SAND | 5.0 |
2014-09-29 | FRAC | 15% HCl | N/A | 20:40 | SAND | 5.0 |
2014-09-29 | FRAC | 15% HCl | N/A | 20:40 | SAND | 5.0 |
2014-09-29 | FRAC | 15% HCl | N/A | 20:40 | SAND | 5.0 |
2014-09-29 | FRAC | 15% HCl | N/A | 20:40 | SAND | 5.0 |
For data sources see[5]
Period | Operator Name | Oil Quantity (m3) | Oil Production Days | GSD Quantity (m3) |
---|---|---|---|---|
2014 | Corex Resources Ltd. | 457.00 | 0 | 0.00 |
2015 | Corex Resources Ltd. | 1,916.20 | 0 | 0.00 |
2016 | Corex Resources Ltd. | 1,098.20 | 0 | 0.00 |
2017 | Corex Resources Ltd. | 781.60 | 0 | 0.00 |
2018 | Corex Resources Ltd. | 608.40 | 0 | 0.00 |
2019 | Corex Resources Ltd. | 122.30 | 0 | 0.00 |
2020 | Corex Resources Ltd. | 59.10 | 0 | 0.00 |
For data sources see[6]
Period | Operator | H2O Quantity (m3) | H20 Waste Production Days | Gas Quantity (m3) | Gas Waste Production Days | CO2 Quantity (m3) | SSW Quantity (m3) |
---|---|---|---|---|---|---|---|
2014 | Corex Resources Ltd. | 2,430.50 | 68 | 0.00 | 0 | 0.00 | 0.00 |
2015 | Corex Resources Ltd. | 14,778.90 | 357 | 0.00 | 0 | 0.00 | 0.00 |
2016 | Corex Resources Ltd. | 17,083.60 | 353 | 0.00 | 0 | 0.00 | 0.00 |
2017 | Corex Resources Ltd. | 19,729.90 | 360 | 0.00 | 0 | 0.00 | 0.00 |
2018 | Corex Resources Ltd. | 13,922.60 | 323 | 0.00 | 0 | 0.00 | 0.00 |
2019 | Corex Resources Ltd. | 3,545.50 | 90 | 0.00 | 0 | 0.00 | 0.00 |
2020 | Corex Resources Ltd. | 1,458.00 | 60 | 0.00 | 0 | 0.00 | 0.00 |
For data sources see[7]