If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 102.09-28-011-26W1 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.94674547,"lon":-100.96662995,"icon":""}]} |
Well Name: North Virden Scallion Unit No. 1 HZNTL | |
Country: Canada | |
Province: Manitoba | |
Township: 011 | |
Meridian: W1 | |
Range: 26 | |
Section: 28 | |
Division: Division No. 6 | |
Subdivision: Wallace-Woodworth | |
Operator Name: Corex Resources Ltd. | |
License Status: Capable Of Oil Production | |
Spud Date: 2018-08-09 | |
License Date: 2018-07-13 | |
Well Total Depth: 1618.00 | |
Latitude: 49.94674547 | |
Longitude: -100.96662995 |
For data sources see[1]
Date | Event |
---|---|
2018-07-13 | Location |
2018-08-13 | Drilling Ahead |
2018-08-15 | Waiting On Service Rig |
2018-08-21 | Completing |
2018-09-18 | Capable Of Oil Production |
For data sources see[2]
Spud Date | Contractor | Rig Number |
---|---|---|
2018-08-09 | Ensign Drilling Inc. | 14 |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots | Shot Volume (m3) | Last Modified |
---|---|---|---|---|---|---|
2018-08-21 | 1600.75 | 1601.05 | 0 | N/A | 2019-09-27 | |
2018-08-21 | 1558.18 | 1558.48 | 0 | N/A | 2019-09-27 | |
2018-08-21 | 1518.33 | 1518.63 | 0 | N/A | 2019-09-27 | |
2018-08-21 | 1478.20 | 1478.50 | 0 | N/A | 2019-09-27 | |
2018-08-21 | 1438.43 | 1438.73 | 0 | N/A | 2019-09-27 | |
2018-08-21 | 1398.77 | 1399.07 | 0 | N/A | 2019-09-27 | |
2018-08-21 | 1358.58 | 1358.88 | 0 | N/A | 2019-09-27 | |
2018-08-21 | 1319.25 | 1319.55 | 0 | N/A | 2019-09-27 | |
2018-08-21 | 1279.16 | 1279.46 | 0 | N/A | 2019-09-27 | |
2018-08-21 | 1240.35 | 1240.65 | 0 | N/A | 2019-09-27 | |
2018-08-21 | 1201.21 | 1201.51 | 0 | N/A | 2019-09-27 | |
2018-08-21 | 1161.66 | 1161.96 | 0 | N/A | 2019-09-27 | |
2018-08-21 | 1122.22 | 1122.52 | 0 | N/A | 2019-09-27 | |
2018-08-21 | 1082.62 | 1082.92 | 0 | N/A | 2019-09-27 | |
2018-08-21 | 1042.88 | 1043.18 | 0 | N/A | 2019-09-27 | |
2018-08-21 | 1002.63 | 1002.93 | 0 | N/A | 2019-09-27 | |
2018-08-21 | 962.93 | 963.23 | 0 | N/A | 2019-09-27 | |
2018-08-21 | 922.69 | 922.99 | 0 | N/A | 2019-09-27 | |
2018-08-21 | 882.68 | 882.98 | 0 | N/A | 2019-09-27 | |
2018-08-21 | 803.68 | 803.98 | 0 | N/A | 2019-09-27 | |
2018-08-21 | 763.43 | 763.73 | 0 | N/A | 2019-09-27 | |
2018-08-21 | 724.74 | 725.04 | 0 | N/A | 2019-09-27 | |
2018-08-21 | 843.37 | 843.67 | 0 | N/A | 2019-09-27 |
For data sources see[4]
Start Date | Treatment Type | Treatment Fluid | Treatment Amount | Additive Type | Agent Type | Agent Amount |
---|---|---|---|---|---|---|
2018-08-21 | FRAC | 15 % HCL | 1.5 | 20/40 | SAND | 5.0 |
2018-08-21 | FRAC | 15 % HCL | 1.5 | 20/40 | SAND | 5.0 |
2018-08-21 | FRAC | 15 % HCL | 1.5 | 20/40 | SAND | 5.0 |
2018-08-21 | FRAC | 15 % HCL | 1.5 | 20/40 | SAND | 5.0 |
2018-08-21 | FRAC | 15 % HCL | 1.5 | 20/40 | SAND | 5.0 |
2018-08-21 | FRAC | 15 % HCL | 1.5 | 20/40 | SAND | 5.0 |
2018-08-21 | FRAC | 15 % HCL | 1.5 | 20/40 | SAND | 5.0 |
2018-08-21 | FRAC | 15 % HCL | 1.5 | 20/40 | SAND | 5.0 |
2018-08-21 | FRAC | 15 % HCL | 2.5 | 20/40 | SAND | 5.0 |
2018-08-21 | FRAC | 15 % HCL | 1.5 | 20/40 | SAND | 5.0 |
2018-08-21 | FRAC | 15 % HCL | 1.5 | 20/40 | SAND | 5.0 |
2018-08-21 | FRAC | 15 % HCL | 1.5 | 20/40 | SAND | 5.0 |
2018-08-21 | FRAC | 15 % HCL | 2.0 | 20/40 | SAND | 5.0 |
2018-08-21 | FRAC | 15 % HCL | 2.0 | 20/40 | SAND | 5.0 |
2018-08-21 | FRAC | 15 % HCL | 2.0 | 20/40 | SAND | 5.0 |
2018-08-21 | FRAC | 15 % HCL | 2.5 | 20/40 | SAND | 5.0 |
2018-08-21 | FRAC | 15 % HCL | 1.5 | 20/40 | SAND | 5.0 |
2018-08-21 | FRAC | 15 % HCL | 1.5 | 20/40 | SAND | 5.0 |
2018-08-21 | FRAC | 15 % HCL | 1.5 | 20/40 | SAND | 5.0 |
2018-08-21 | FRAC | 15 % HCL | 1.5 | 20/40 | SAND | 5.0 |
2018-08-21 | FRAC | 15 % HCL | 1.5 | 20/40 | SAND | 5.0 |
2018-08-21 | FRAC | 15 % HCL | 1.5 | 20/40 | SAND | 5.0 |
2018-08-21 | FRAC | 15 % HCL | 1.5 | 20/40 | SAND | 5.0 |
For data sources see[5]
Period | Operator Name | Oil Quantity (m3) | Oil Production Days | GSD Quantity (m3) |
---|---|---|---|---|
2018 | Corex Resources Ltd. | 1,418.90 | 0 | 0.00 |
2019 | Corex Resources Ltd. | 567.70 | 0 | 0.00 |
2020 | Corex Resources Ltd. | 139.50 | 0 | 0.00 |
For data sources see[6]
Period | Operator | H2O Quantity (m3) | H20 Waste Production Days | Gas Quantity (m3) | Gas Waste Production Days | CO2 Quantity (m3) | SSW Quantity (m3) |
---|---|---|---|---|---|---|---|
2018 | Corex Resources Ltd. | 1,398.00 | 105 | 0.00 | 0 | 0.00 | 0.00 |
2019 | Corex Resources Ltd. | 640.30 | 90 | 0.00 | 0 | 0.00 | 0.00 |
2020 | Corex Resources Ltd. | 179.80 | 60 | 0.00 | 0 | 0.00 | 0.00 |
For data sources see[7]