If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 102.12-06-011-25W1 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.9028263,"lon":-100.89918751,"icon":""}]} |
Well Name: Virden Roselea Unit No. 2 HZNTL | |
Country: Canada | |
Province: Manitoba | |
Township: 011 | |
Meridian: W1 | |
Range: 26 | |
Section: 12 | |
Division: Division No. 6 | |
Subdivision: Wallace-Woodworth | |
Operator Name: Corex Resources Ltd. | |
License Status: Capable Of Oil Production | |
Spud Date: 2015-02-01 | |
License Date: 2015-01-21 | |
Well Total Depth: 1509.00 | |
Latitude: 49.9028263 | |
Longitude: -100.89918751 |
For data sources see[1]
Date | Event |
---|---|
2015-01-21 | Location |
2015-02-08 | Waiting On Service Rig |
2015-03-16 | Capable Of Oil Production |
For data sources see[2]
Spud Date | Contractor | Rig Number |
---|---|---|
2015-02-01 | Precision Drilling | 205 |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots | Shot Volume (m3) | Last Modified |
---|---|---|---|---|---|---|
2015-02-27 | 1488.02 | 1492.54 | 0 | N/A | 2018-09-20 | |
2015-02-27 | 1442.00 | 1446.53 | 0 | N/A | 2018-09-20 | |
2015-02-27 | 1398.66 | 1403.19 | 0 | N/A | 2018-09-20 | |
2015-02-27 | 1355.33 | 1359.86 | 0 | N/A | 2018-09-20 | |
2015-02-27 | 1312.00 | 1316.52 | 0 | N/A | 2018-09-20 | |
2015-02-27 | 1268.68 | 1273.20 | 0 | N/A | 2018-09-20 | |
2015-02-27 | 1225.35 | 1229.87 | 0 | N/A | 2018-09-20 | |
2015-02-27 | 1182.01 | 1186.54 | 0 | N/A | 2018-09-20 | |
2015-02-27 | 1138.70 | 1143.22 | 0 | N/A | 2018-09-20 | |
2015-02-27 | 1095.36 | 1099.89 | 0 | N/A | 2018-09-20 | |
2015-02-27 | 1052.04 | 1056.56 | 0 | N/A | 2018-09-20 | |
2015-02-27 | 1008.75 | 1013.27 | 0 | N/A | 2018-09-20 | |
2015-02-27 | 965.43 | 969.96 | 0 | N/A | 2018-09-20 | |
2015-02-27 | 922.10 | 926.63 | 0 | N/A | 2018-09-20 | |
2015-02-27 | 878.75 | 883.29 | 0 | N/A | 2018-09-20 | |
2015-02-27 | 835.66 | 840.18 | 0 | N/A | 2018-09-20 | |
2015-02-27 | 792.35 | 796.87 | 0 | N/A | 2018-09-20 |
For data sources see[4]
Start Date | Treatment Type | Treatment Fluid | Treatment Amount | Additive Type | Agent Type | Agent Amount |
---|---|---|---|---|---|---|
2015-02-27 | FRAC | HCL | 0.3 | 20/40 | SAND | 5.0 |
2015-02-28 | FRAC | HCL | 0.3 | 20/40 | SAND | 5.0 |
2015-02-28 | FRAC | HCL | 0.3 | 5 | SAND | 5.0 |
2015-02-28 | FRAC | HCL | 0.3 | 20/40 | SAND | 5.0 |
2015-02-28 | FRAC | HCL | 0.3 | 20/40 | SAND | 5.0 |
2015-02-28 | FRAC | HCL | 0.3 | 20/40 | SAND | 5.0 |
2015-02-28 | FRAC | HCL | 0.3 | 20/40 | SAND | 5.0 |
2015-02-28 | FRAC | HCL | 0.3 | 20/40 | SAND | 5.0 |
2015-02-28 | FRAC | HCL | 0.3 | 20/40 | SAND | 5.0 |
2015-02-27 | FRAC | HCL | 0.3 | 20/40 | SAND | 5.0 |
2015-02-27 | FRAC | HCL | 0.3 | 20/40 | SAND | 5.0 |
2015-02-28 | FRAC | HCL | 0.3 | 20/40 | SAND | 5.0 |
2015-02-28 | FRAC | HCL | 0.3 | 20/40 | SAND | 5.0 |
2015-02-28 | FRAC | HCL | 0.3 | 20/40 | SAND | 5.0 |
2015-02-28 | FRAC | HCL | 0.3 | 20/40 | SAND | 5.0 |
2015-02-28 | FRAC | HCL | 0.3 | 20/40 | SAND | 5.0 |
2015-02-28 | FRAC | HCL | 0.3 | 20/40 | SAND | 5.0 |
For data sources see[5]
Period | Operator Name | Oil Quantity (m3) | Oil Production Days | GSD Quantity (m3) |
---|---|---|---|---|
2015 | Corex Resources Ltd. | 1,649.50 | 0 | 0.00 |
2016 | Corex Resources Ltd. | 1,458.90 | 0 | 0.00 |
2017 | Corex Resources Ltd. | 1,293.70 | 0 | 0.00 |
2018 | Corex Resources Ltd. | 1,152.00 | 0 | 0.00 |
2019 | Corex Resources Ltd. | 107.40 | 0 | 0.00 |
2020 | Corex Resources Ltd. | 20.10 | 0 | 0.00 |
For data sources see[6]
Period | Operator | H2O Quantity (m3) | H20 Waste Production Days | Gas Quantity (m3) | Gas Waste Production Days | CO2 Quantity (m3) | SSW Quantity (m3) |
---|---|---|---|---|---|---|---|
2015 | Corex Resources Ltd. | 18,636.60 | 258 | 0.00 | 0 | 0.00 | 0.00 |
2016 | Corex Resources Ltd. | 26,534.60 | 338 | 0.00 | 0 | 0.00 | 0.00 |
2017 | Corex Resources Ltd. | 28,889.30 | 348 | 0.00 | 0 | 0.00 | 0.00 |
2018 | Corex Resources Ltd. | 27,537.70 | 331 | 0.00 | 0 | 0.00 | 0.00 |
2019 | Corex Resources Ltd. | 3,593.40 | 43 | 0.00 | 0 | 0.00 | 0.00 |
2020 | Corex Resources Ltd. | 1,324.90 | 26 | 0.00 | 0 | 0.00 | 0.00 |
For data sources see[7]