X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

102.13-17-008-28W1

Well Details

Well ID: 102.13-17-008-28W1
Loading map...
Well Name: Ewart Unit No. 11 HZNTL WIW
Country: Canada
Province: Manitoba
Township: 008
Meridian: W1
Range: 28
Section: 16
Division: Division No. 6
Subdivision: Pipestone
Operator Name: Tundra Oil & Gas Limited
License Status: Water Injection Well
Spud Date: 2012-06-17
License Date: 2012-06-21
Well Total Depth: 2339.00
Latitude: 49.66394068
Longitude: -101.23413088

For data sources see[1]

Well History

Date Event
2012-06-21 Location
2012-09-10 Drilling Ahead
2012-09-14 Waiting On Service Rig
2012-10-16 Completing
2012-10-17 Capable Of Oil Production
2019-03-04 Water Injection Well

For data sources see[2]

Spud Data

Spud Date Contractor Rig Number
2012-06-17 Ensign - Trinidad Drilling Inc. 9

For data sources see[3]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots Shot Volume (m3) Last Modified
2012-10-04 LINER PORT 1177.00 1177.00 0 N/A 2016-06-20
2012-10-04 LINER PORT 1122.00 1122.00 0 N/A 2016-06-20
2012-10-04 LINER PORT 1067.00 1067.00 0 N/A 2016-06-20
2012-10-04 LINER PORT 1011.00 1011.00 0 N/A 2016-06-20
2012-10-04 LINER PORT 956.00 956.00 0 N/A 2016-06-20
2012-10-03 LINER PORT 2344.00 2344.00 0 N/A 2016-06-20
2012-10-03 LINER PORT 2275.00 2275.00 0 N/A 2016-06-20
2012-10-03 LINER PORT 2233.00 2233.00 0 N/A 2016-06-20
2012-10-03 LINER PORT 2190.00 2190.00 0 N/A 2016-06-20
2012-10-03 LINER PORT 2148.00 2148.00 0 N/A 2016-06-20
2012-10-03 LINER PORT 2105.00 2105.00 0 N/A 2016-06-20
2012-10-03 LINER PORT 2062.00 2062.00 0 N/A 2016-06-20
2012-10-03 LINER PORT 2019.00 2019.00 0 N/A 2016-06-20
2012-10-04 LINER PORT 1977.00 1977.00 0 N/A 2016-06-20
2012-10-04 LINER PORT 1934.00 1934.00 0 N/A 2016-06-20
2012-10-04 LINER PORT 1892.00 1892.00 0 N/A 2016-06-20
2012-10-04 LINER PORT 1849.00 1849.00 0 N/A 2016-06-20
2012-10-04 LINER PORT 1807.00 1807.00 0 N/A 2016-06-20
2012-10-04 LINER PORT 1764.00 1764.00 0 N/A 2016-06-20
2012-10-04 LINER PORT 1722.00 1722.00 0 N/A 2016-06-20
2012-10-04 LINER PORT 1679.00 1679.00 0 N/A 2016-06-20
2012-10-04 LINER PORT 1637.00 1637.00 0 N/A 2016-06-20
2012-10-04 LINER PORT 1594.00 1594.00 0 N/A 2016-06-20
2012-10-04 LINER PORT 1552.00 1552.00 0 N/A 2016-06-20
2012-10-04 LINER PORT 1509.00 1509.00 0 N/A 2016-06-20
2012-10-04 LINER PORT 1454.00 1454.00 0 N/A 2016-06-20
2012-10-04 LINER PORT 1398.00 1398.00 0 N/A 2016-06-20
2012-10-04 LINER PORT 1343.00 1343.00 0 N/A 2016-06-20
2012-10-04 LINER PORT 1288.00 1288.00 0 N/A 2016-06-20
2012-10-04 LINER PORT 1233.00 1233.00 0 N/A 2016-06-20

For data sources see[4]

Well Treatment Data

Start Date Treatment Type Treatment Fluid Treatment Amount Additive Type Agent Type Agent Amount
2012-10-03 FRAC N/A 20/40 SAND 6.0
2012-10-04 FRAC N/A 20/40 SAND 4.0
2012-10-04 FRAC N/A 20/40 SAND 4.0
2012-10-04 FRAC N/A 20/40 SAND 4.0
2012-10-04 FRAC N/A 20/40 SAND 6.0
2012-10-04 FRAC N/A 20/40 SAND 6.0
2012-10-04 FRAC N/A 20/40 SAND 4.0
2012-10-04 FRAC N/A 20/40 SAND 4.0
2012-10-04 FRAC N/A 20/40 SAND 4.0
2012-10-04 FRAC N/A 20/40 SAND 6.0
2012-10-04 FRAC N/A 20/40 SAND 6.0
2012-10-03 FRAC N/A 20/40 SAND 6.0
2012-10-04 FRAC N/A 20/40 SAND 6.0
2012-10-04 FRAC N/A 20/40 SAND 6.0
2012-10-04 FRAC N/A 20/40 SAND 6.0
2012-10-04 FRAC N/A 20/40 SAND 6.0
2012-10-04 FRAC N/A 20/40 SAND 6.0
2012-10-04 FRAC N/A 20/40 SAND 6.0
2012-10-04 FRAC N/A 20/40 SAND 6.0
2012-10-04 FRAC N/A 20/40 SAND 6.0
2012-10-04 FRAC N/A 20/40 SAND 6.0
2012-10-04 FRAC N/A 20/40 SAND 6.0
2012-10-03 FRAC N/A 20/40 SAND 4.0
2012-10-04 FRAC N/A 20/40 SAND 6.0
2012-10-03 FRAC N/A 20/40 SAND 4.0
2012-10-03 FRAC N/A 20/40 SAND 6.0
2012-10-03 FRAC N/A 20/40 SAND 6.0
2012-10-03 FRAC N/A 20/40 SAND 6.0
2012-10-03 FRAC N/A 20/40 SAND 6.0
2012-10-04 FRAC N/A 20/40 SAND 6.0

For data sources see[5]

Production Data

Period Operator Name Oil Quantity (m3) Oil Production Days GSD Quantity (m3)
2014 Tundra Oil & Gas Limited 1,975.80 0 0.00
2015 Tundra Oil & Gas Limited 1,878.10 0 0.00
2016 Tundra Oil & Gas Limited 2,155.00 0 0.00
2017 Tundra Oil & Gas Limited 1,490.60 0 0.00
2018 Tundra Oil & Gas Limited 2,211.60 0 0.00
2019 Tundra Oil & Gas Limited 78.50 0 0.00
2020 Tundra Oil & Gas Limited 0.00 0 0.00

For data sources see[6]

Waste Data

Period Operator H2O Quantity (m3) H20 Waste Production Days Gas Quantity (m3) Gas Waste Production Days CO2 Quantity (m3) SSW Quantity (m3)
2014 Tundra Oil & Gas Limited 166.50 352 0.00 0 0.00 0.00
2015 Tundra Oil & Gas Limited 130.60 356 0.00 0 0.00 0.00
2016 Tundra Oil & Gas Limited 122.40 353 0.00 0 0.00 0.00
2017 Tundra Oil & Gas Limited 128.20 361 1.60 722 0.00 0.00
2018 Tundra Oil & Gas Limited 100.40 360 0.00 720 0.00 0.00
2019 Tundra Oil & Gas Limited 1.00 30 0.00 60 0.00 0.00
2020 Tundra Oil & Gas Limited 0.00 0 0.00 0 0.00 0.00

For data sources see[7]

References

  1. "Digital Data - Well". Province of Manitoba: Growth, Enterprise and Trade Branch. 2020-06-12. Retrieved 2020-07-30. 
  2. "Digital Data - Status History". Province of Manitoba: Growth, Enterprise and Trade Branch. 2020-06-12. Retrieved 2020-07-30. 
  3. "Digital Data - Drilling Rigs". Province of Manitoba: Growth, Enterprise and Trade Branch. 2020-06-12. Retrieved 2020-07-30. 
  4. "Digital Data - Perfs". Province of Manitoba: Growth, Enterprise and Trade Branch. 2020-06-12. Retrieved 2020-07-30. 
  5. "Digital Data - Well Treatments". Province of Manitoba: Growth, Enterprise and Trade Branch. 2020-06-12. Retrieved 2020-07-30. 
  6. "Production Reports". Province of Manitoba: Growth, Enterprise and Trade Branch. 2020-05-24. Retrieved 2020-07-30. 
  7. "Production Reports". Province of Manitoba: Growth, Enterprise and Trade Branch. 2020-05-24. Retrieved 2020-07-30.