If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 103.09-32-008-29W1 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.70186397,"lon":-101.39629745,"icon":""}]} |
Well Name: Ebor Unit No. 3 Prov. HZNTL | |
Country: Canada | |
Province: Manitoba | |
Township: 008 | |
Meridian: W1 | |
Range: 29 | |
Section: 31 | |
Division: Division No. 6 | |
Subdivision: Pipestone | |
Operator Name: Tundra Oil & Gas Limited | |
License Status: Capable Of Oil Production | |
Spud Date: 2018-10-20 | |
License Date: 2018-05-18 | |
Well Total Depth: 2516.00 | |
Latitude: 49.70186397 | |
Longitude: -101.39629745 |
For data sources see[1]
Date | Event |
---|---|
2018-05-18 | Location |
2018-07-21 | Waiting On Service Rig |
2018-09-18 | Completing |
2018-10-07 | Capable Of Oil Production |
For data sources see[2]
Spud Date | Contractor | Rig Number |
---|---|---|
2018-10-20 | Ensign - Trinidad Drilling Inc. | 9 |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots | Shot Volume (m3) | Last Modified |
---|---|---|---|---|---|---|
2018-09-20 | 2284.89 | 2294.34 | 0 | N/A | 2019-05-06 | |
2018-09-20 | 2437.56 | 2447.56 | 0 | N/A | 2019-05-06 | |
2018-09-20 | 2332.33 | 2341.78 | 0 | N/A | 2019-05-06 | |
2018-09-21 | 2208.61 | 2218.06 | 0 | N/A | 2019-05-06 | |
2018-09-21 | 2132.32 | 2141.77 | 0 | N/A | 2019-05-06 | |
2018-09-21 | 2027.46 | 2036.91 | 0 | N/A | 2019-05-06 | |
2018-09-21 | 1970.08 | 1979.53 | 0 | N/A | 2019-05-06 | |
2018-09-21 | 1894.52 | 1903.97 | 0 | N/A | 2019-05-06 | |
2018-09-22 | 1814.53 | 1823.98 | 0 | N/A | 2019-05-06 | |
2018-09-22 | 1714.40 | 1714.40 | 0 | N/A | 2019-05-06 | |
2018-09-22 | 1662.72 | 1672.17 | 0 | N/A | 2019-05-06 | |
2018-09-23 | 1586.83 | 1596.28 | 0 | N/A | 2019-05-06 | |
2018-09-24 | 1500.56 | 1510.01 | 0 | N/A | 2019-05-06 | |
2018-09-24 | 1424.63 | 1434.08 | 0 | N/A | 2019-05-06 | |
2018-09-24 | 1348.63 | 1358.08 | 0 | N/A | 2019-05-06 | |
2018-09-24 | 1276.35 | 1276.35 | 0 | N/A | 2019-05-06 | |
2018-09-25 | 1262.53 | 1272.00 | 0 | N/A | 2019-05-06 |
For data sources see[4]
Start Date | Treatment Type | Treatment Fluid | Treatment Amount | Additive Type | Agent Type | Agent Amount |
---|---|---|---|---|---|---|
2018-09-20 | FRAC | N/A | 20/40 | SAND | 5.0 | |
2018-09-22 | FRAC | N/A | 20/40 | SAND | 5.0 | |
2018-09-22 | FRAC | N/A | 20/40 | SAND | 5.0 | |
2018-09-23 | FRAC | N/A | 20/40 | SAND | 5.0 | |
2018-09-24 | FRAC | N/A | 20/40 | SAND | 5.0 | |
2018-09-24 | FRAC | N/A | 20/40 | SAND | 5.0 | |
2018-09-24 | FRAC | N/A | 20/40 | SAND | 5.0 | |
2018-09-24 | FRAC | N/A | 20/40 | SAND | 5.0 | |
2018-09-25 | FRAC | N/A | 20/40 | SAND | 1.3 | |
2018-09-26 | FRAC | N/A | 20/40 | SAND | N/A | |
2018-09-20 | FRAC | N/A | 20/40 | SAND | 5.0 | |
2018-09-20 | FRAC | N/A | 20/40 | SAND | 5.0 | |
2018-09-21 | FRAC | N/A | 20/40 | SAND | 5.0 | |
2018-09-21 | FRAC | N/A | 20/40 | SAND | 5.0 | |
2018-09-21 | FRAC | N/A | 20/40 | SAND | 5.0 | |
2018-09-21 | FRAC | N/A | 20/40 | SAND | 5.0 | |
2018-09-21 | FRAC | N/A | 20/40 | SAND | 5.0 | |
2018-09-22 | FRAC | N/A | 20/40 | SAND | 5.0 |
For data sources see[5]
Period | Operator Name | Oil Quantity (m3) | Oil Production Days | GSD Quantity (m3) |
---|---|---|---|---|
2018 | Tundra Oil & Gas Limited | 485.80 | 0 | 0.00 |
2019 | Tundra Oil & Gas Limited | 1,557.10 | 0 | 0.00 |
2020 | Tundra Oil & Gas Limited | 187.30 | 0 | 0.00 |
For data sources see[6]
Period | Operator | H2O Quantity (m3) | H20 Waste Production Days | Gas Quantity (m3) | Gas Waste Production Days | CO2 Quantity (m3) | SSW Quantity (m3) |
---|---|---|---|---|---|---|---|
2018 | Tundra Oil & Gas Limited | 402.10 | 88 | 0.00 | 0 | 0.00 | 0.00 |
2019 | Tundra Oil & Gas Limited | 910.00 | 364 | 0.00 | 0 | 0.00 | 0.00 |
2020 | Tundra Oil & Gas Limited | 68.90 | 60 | 0.00 | 0 | 0.00 | 0.00 |
For data sources see[7]