If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 103.15-10-010-28W1 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.82571603,"lon":-101.22185076,"icon":""}]} |
Well Name: Daly Unit No. 15 Prov. HZNTL | |
Country: Canada | |
Province: Manitoba | |
Township: 010 | |
Meridian: W1 | |
Range: 28 | |
Section: 09 | |
Division: Division No. 6 | |
Subdivision: Wallace-Woodworth | |
Operator Name: Corex Resources Ltd. | |
License Status: Capable Of Oil Production | |
Spud Date: 2020-01-05 | |
License Date: 2019-06-28 | |
Well Total Depth: 2373.00 | |
Latitude: 49.82571603 | |
Longitude: -101.22185076 |
For data sources see[1]
Date | Event |
---|---|
2019-06-28 | Location |
2019-10-21 | Drilling Ahead |
2019-10-25 | Waiting On Service Rig |
2019-11-02 | Completing |
2019-11-27 | Capable Of Oil Production |
For data sources see[2]
Spud Date | Contractor | Rig Number |
---|---|---|
2020-01-05 | Ensign Drilling Inc. | 14 |
For data sources see[3]
Start Date | Treatment Type | Treatment Fluid | Treatment Amount | Additive Type | Agent Type | Agent Amount |
---|---|---|---|---|---|---|
2019-10-25 | FRAC | 15 % HCL | 2.0 | SAND | 8.0 | |
2019-10-25 | FRAC | 15 % HCL | 2.0 | SAND | 8.0 | |
2019-10-25 | FRAC | 15 % HCL | 2.0 | SAND | 8.0 | |
2019-10-25 | FRAC | 15 % HCL | 2.0 | SAND | 8.0 | |
2019-10-25 | FRAC | 15 % HCL | 2.0 | SAND | 8.0 | |
2019-10-25 | FRAC | 15 % HCL | 2.0 | SAND | 8.0 | |
2019-10-25 | FRAC | 15 % HCL | 2.0 | SAND | 8.0 | |
2019-10-25 | FRAC | 15 % HCL | 2.0 | SAND | 8.0 | |
2019-10-25 | FRAC | 15 % HCL | 2.0 | SAND | 8.0 | |
2019-10-25 | FRAC | 15 % HCL | 2.0 | SAND | 8.0 | |
2019-10-25 | FRAC | 15 % HCL | 2.0 | SAND | 8.0 | |
2019-10-25 | FRAC | 15 % HCL | 2.0 | SAND | 8.0 | |
2019-10-25 | FRAC | 15 % HCL | 2.0 | SAND | 8.0 | |
2019-10-25 | FRAC | 15 % HCL | 2.0 | SAND | 8.0 | |
2019-10-25 | FRAC | 15 % HCL | 2.0 | SAND | 8.0 | |
2019-10-25 | FRAC | 15 % HCL | 2.0 | SAND | 8.0 | |
2019-10-25 | FRAC | 15 % HCL | 2.0 | SAND | 8.0 | |
2019-10-25 | FRAC | 15 % HCL | 2.0 | SAND | 8.0 | |
2019-10-25 | FRAC | 15 % HCL | 2.0 | SAND | 8.0 | |
2019-10-25 | FRAC | 15 % HCL | 2.0 | SAND | 8.0 | |
2019-10-25 | FRAC | 15 % HCL | 2.0 | SAND | 8.0 | |
2019-10-25 | FRAC | 15 % HCL | 2.0 | SAND | 8.0 | |
2019-10-25 | FRAC | 15 % HCL | 2.0 | SAND | 8.0 | |
2019-10-25 | FRAC | 15 % HCL | 2.0 | SAND | 8.0 | |
2019-10-25 | FRAC | 15 % HCL | 2.0 | SAND | 8.0 | |
2019-10-25 | FRAC | 15 % HCL | 2.0 | SAND | 8.0 | |
2019-10-25 | FRAC | 15 % HCL | 2.0 | SAND | 8.0 | |
2019-10-25 | FRAC | 15 % HCL | 2.0 | SAND | 8.0 | |
2019-10-25 | FRAC | 15 % HCL | 2.0 | SAND | 8.0 | |
2019-10-25 | FRAC | 15 % HCL | 2.0 | SAND | 8.0 | |
2019-10-25 | FRAC | 15 % HCL | 2.0 | SAND | 8.0 | |
2019-10-25 | FRAC | 15 % HCL | 2.0 | SAND | 8.0 | |
2019-10-25 | FRAC | 15 % HCL | 2.0 | SAND | 8.0 | |
2019-10-25 | FRAC | 15 % HCL | 2.0 | SAND | 8.0 | |
2019-10-25 | FRAC | 15 % HCL | 2.0 | SAND | 8.0 |
For data sources see[4]
Period | Operator Name | Oil Quantity (m3) | Oil Production Days | GSD Quantity (m3) |
---|---|---|---|---|
2019 | Corex Resources Ltd. | 1,018.80 | 0 | 0.00 |
2020 | Corex Resources Ltd. | 1,210.20 | 0 | 0.00 |
For data sources see[5]
Period | Operator | H2O Quantity (m3) | H20 Waste Production Days | Gas Quantity (m3) | Gas Waste Production Days | CO2 Quantity (m3) | SSW Quantity (m3) |
---|---|---|---|---|---|---|---|
2019 | Corex Resources Ltd. | 190.40 | 33 | 0.00 | 0 | 0.00 | 0.00 |
2020 | Corex Resources Ltd. | 343.60 | 58 | 0.00 | 0 | 0.00 | 0.00 |
For data sources see[6]