If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 105.13-29-008-28W1 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.69431394,"lon":-101.2345666,"icon":""}]} |
| Well Name: Ewart Unit No. 9 Prov. HZNTL | |
| Country: Canada | |
| Province: Manitoba | |
| Township: 008 | |
| Meridian: W1 | |
| Range: 28 | |
| Section: 28 | |
| Division: Division No. 6 | |
| Subdivision: Pipestone | |
| Operator Name: Tundra Oil & Gas Limited | |
| License Status: Capable Of Oil Production | |
| Spud Date: 2017-10-13 | |
| License Date: 2017-10-11 | |
| Well Total Depth: 2307.00 | |
| Latitude: 49.69431394 | |
| Longitude: -101.2345666 |
For data sources see[1]
| Date | Event |
|---|---|
| 2017-10-11 | Location |
| 2017-10-16 | Waiting On Service Rig |
| 2017-11-29 | Completing |
| 2017-12-01 | Capable Of Oil Production |
For data sources see[2]
| Spud Date | Contractor | Rig Number |
|---|---|---|
| 2017-10-13 | Ensign Drilling Inc. | 10 |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots | Shot Volume (m3) | Last Modified |
|---|---|---|---|---|---|---|
| 2017-11-05 | 2279.61 | 2289.61 | 0 | N/A | 2019-01-02 | |
| 2017-11-05 | 2227.32 | 2237.32 | 0 | N/A | 2019-01-02 | |
| 2017-11-05 | 2175.10 | 2185.10 | 0 | N/A | 2019-01-02 | |
| 2017-11-05 | 2121.43 | 2131.43 | 0 | N/A | 2019-01-02 | |
| 2017-11-05 | 2068.68 | 2078.68 | 0 | N/A | 2019-01-02 | |
| 2017-11-05 | 2016.75 | 2026.75 | 0 | N/A | 2019-01-02 | |
| 2017-11-05 | 1963.84 | 1973.84 | 0 | N/A | 2019-01-02 | |
| 2017-11-05 | 1898.05 | 1898.05 | 0 | N/A | 2019-01-02 | |
| 2017-11-05 | 1818.71 | 1818.71 | 0 | N/A | 2019-01-02 | |
| 2017-11-05 | 1765.59 | 1765.69 | 0 | N/A | 2019-01-02 | |
| 2017-11-05 | 1712.38 | 1722.38 | 0 | N/A | 2019-01-02 | |
| 2017-11-05 | 1659.63 | 1669.63 | 0 | N/A | 2019-01-02 | |
| 2017-11-05 | 1594.04 | 1604.04 | 0 | N/A | 2019-01-02 | |
| 2017-11-05 | 1529.39 | 1539.39 | 0 | N/A | 2019-01-02 | |
| 2017-11-05 | 1464.04 | 1474.04 | 0 | N/A | 2019-01-02 | |
| 2017-11-05 | 1398.84 | 1408.84 | 0 | N/A | 2019-01-02 | |
| 2017-11-06 | 1332.70 | 1342.70 | 0 | N/A | 2019-01-02 | |
| 2017-11-06 | 1268.00 | 1278.00 | 0 | N/A | 2019-01-02 | |
| 2017-11-06 | 1202.60 | 1212.60 | 0 | N/A | 2019-01-02 | |
| 2017-11-06 | 1137.40 | 1147.40 | 0 | N/A | 2019-01-02 | |
| 2017-11-06 | 1072.20 | 1082.20 | 0 | N/A | 2019-01-02 | |
| 2017-11-06 | 1020.10 | 1030.10 | 0 | N/A | 2019-01-02 | |
| 2017-11-06 | 967.40 | 977.40 | 0 | N/A | 2019-01-02 | |
| 2017-11-06 | 914.40 | 924.40 | 0 | N/A | 2019-01-02 |
For data sources see[4]
| Start Date | Treatment Type | Treatment Fluid | Treatment Amount | Additive Type | Agent Type | Agent Amount |
|---|---|---|---|---|---|---|
| 2017-11-05 | FRAC | 15 % HCL | 1.0 | 20/40 | SAND | 14.0 |
| 2017-11-05 | FRAC | 15 % HCL | N/A | 20/40 | SAND | N/A |
| 2017-11-05 | FRAC | 15 % HCL | 2.0 | 20/40 | SAND | 14.0 |
| 2017-11-05 | FRAC | 15 % HCL | 1.0 | 20/40 | SAND | 14.0 |
| 2017-11-05 | FRAC | 15 % HCL | 2.0 | 20/40 | SAND | 14.0 |
| 2017-11-05 | FRAC | 15 % HCL | 2.0 | 20/40 | SAND | 14.0 |
| 2017-11-05 | FRAC | 15 % HCL | 4.0 | 20/40 | SAND | 12.5 |
| 2017-11-05 | FRAC | 15 % HCL | 2.0 | 20/40 | SAND | 14.0 |
| 2017-11-06 | FRAC | 15 % HCL | 2.0 | 20/40 | SAND | 14.0 |
| 2017-11-06 | FRAC | 15 % HCL | 1.0 | 20/40 | SAND | 14.0 |
| 2017-11-06 | FRAC | 15 % HCL | 1.0 | 20/40 | SAND | 14.0 |
| 2017-11-05 | FRAC | 15 % HCL | 1.0 | 20/40 | SAND | 8.0 |
| 2017-11-06 | FRAC | 15 % HCL | 2.0 | 20/40 | SAND | 14.0 |
| 2017-11-06 | FRAC | 15 % HCL | 2.0 | 20/40 | SAND | 13.0 |
| 2017-11-06 | FRAC | 15 % HCL | 2.0 | 20/40 | SAND | 14.0 |
| 2017-11-06 | FRAC | 15 % HCL | 2.0 | 20/40 | SAND | 11.5 |
| 2017-11-06 | FRAC | 15 % HCL | 2.0 | 20/40 | SAND | 6.0 |
| 2017-11-05 | FRAC | 15 % HCL | 1.0 | 20/40 | SAND | 14.0 |
| 2017-11-05 | FRAC | 15 % HCL | 1.0 | 20/40 | SAND | 14.0 |
| 2017-11-05 | FRAC | 15 % HCL | 1.0 | 20/40 | SAND | 12.0 |
| 2017-11-05 | FRAC | 15 % HCL | 1.0 | 20/40 | SAND | 14.0 |
| 2017-11-05 | FRAC | 15 % HCL | 1.0 | 20/40 | SAND | 14.0 |
| 2017-11-05 | FRAC | 15 % HCL | N/A | 20/40 | SAND | N/A |
| 2017-11-05 | FRAC | 15 % HCL | N/A | 20/40 | SAND | N/A |
For data sources see[5]
| Period | Operator Name | Oil Quantity (m3) | Oil Production Days | GSD Quantity (m3) |
|---|---|---|---|---|
| 2017 | Tundra Oil & Gas Limited | 448.20 | 0 | 0.00 |
| 2018 | Tundra Oil & Gas Limited | 7,616.00 | 0 | 0.00 |
| 2019 | Tundra Oil & Gas Limited | 1,012.90 | 0 | 0.00 |
| 2020 | Tundra Oil & Gas Limited | 455.50 | 0 | 0.00 |
For data sources see[6]
| Period | Operator | H2O Quantity (m3) | H20 Waste Production Days | Gas Quantity (m3) | Gas Waste Production Days | CO2 Quantity (m3) | SSW Quantity (m3) |
|---|---|---|---|---|---|---|---|
| 2017 | Tundra Oil & Gas Limited | 219.30 | 25 | 0.00 | 0 | 0.00 | 0.00 |
| 2018 | Tundra Oil & Gas Limited | 688.00 | 353 | 0.00 | 0 | 0.00 | 0.00 |
| 2019 | Tundra Oil & Gas Limited | 103.70 | 87 | 0.00 | 0 | 0.00 | 0.00 |
| 2020 | Tundra Oil & Gas Limited | 10.20 | 60 | 0.00 | 0 | 0.00 | 0.00 |
For data sources see[7]